Patents
US 2009198477 A1#1819849 Most Cited · 34 citations2.0/yr · PR 7.67PendingUS · Application
Method For Comparing And Back Allocating Production

Methods and system for incorporating downhole and surface data with models and adjustment algorithms to back allocate flow rates of commingled zones. The models include fluid flow in the reservoir and wellbore, pressure drop across a choke, and fluid flow in the well completion.…

US 2013220604 A1#1874349 Most Cited · 34 citations2.6/yr · PR 3.58PendingUS · Application
Methods For Establishing A Subsurface Fracture Network

A method of creating a network of fractures in a reservoir is provided. The method includes designing a desired fracture network system, and determining required in situ stresses to create the desired fracture network within the reservoir. The method further includes designing a…

US 8,473,268 B2#5963196 Most Cited · 16 citations1.2/yr · PR 1.80ActiveUS · Utility
Method for comparing and back allocating production
Inventors: Benish Timothy G, Mccracken Michael EAssignee: Benish Timothy G, Mccracken Michael EFiled 2007-04-27 · Granted 2013-06-25

Methods and system for incorporating downhole and surface data with models and adjustment algorithms to back allocate flow rates of commingled zones. The models include fluid flow in the reservoir and wellbore, pressure drop across a choke, and fluid flow in the well completion.…

US 2013110485 A1#10426973 Most Cited · 10 citations0.8/yr · PR 2.11PendingUS · Application
Determining Interwell Communication

There is provided a system and method for determining interwell communication in a hydrocarbon-producing field that has a plurality of wells. An exemplary method comprises determining communication relationships for the plurality of wells using a multivariate dynamic joint…

WO 2012/015528 A1#15809170 Most Cited · 7 citations0.5/yr · PR 1.53PendingWO · Application
Enhanced hydrocarbon fluid recovery via formation collapse

Methods for improving hydrocarbon production from a subsurface formation, such as a low-permeability formation, are provided herein. The methods may involve drilling a wellbore into the subsurface formation, and analyzing a mineralogy of a rock matrix making up the formation.…

WO 2006/057747 A1#42835491 Most Cited · 2 citations0.1/yr · PR 0.95PendingWO · Application
Scheduling between digital projection and film projection

Method for scheduling a playlist in a multi-screen digital cinema theater, which includes: (a) generating and displaying a table of playlists currently available for scheduling; (b) generating and displaying a schedule table showing a schedule view for each screen as an…

WO 2010/016910 A2#66811762 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Multi-node system operating status display

A method for displaying operational status and health of a system, such as a multi-venue theater management system, by generating a perspective display mode image including system element images depicted and arranged according to a system configuration and generating and…

WO 2010/016910 A3#66583800 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Multi-node system operating status display

A method for displaying operational status and health of a system, such as a multi-venue theater management system, by generating a perspective display mode image including system element images depicted and arranged according to a system configuration and generating and…