A method of cementing an off bottom liner including the steps of establishing a first flow blockage in the liner at a location down-hole of a cementing valve located in the side wall of the liner, opening the cementing valve which exposes openings in the sidewall of the liner,…
Lumbye Peter
An assembly arranged in a well bore and run in conjunction with a perforated or a non perforated liner has an inflatable packer section prepared for being expanded by fluid and a valve device for opening and closing of fluid communication into the inflatable packer section. The…
A tubular introduced into a wellbore is perforated at pre-selected locations after the tubular has been cemented into place. The locations of the perforations are determined by modeling inflow performance of a stimulation fluid within the formation. The inflow performance…
An assembly arranged in a well bore and run in conjunction with a perforated or a non perforated liner has an inflatable packer section prepared for being expanded by fluid and a valve device for opening and closing of fluid communication into the inflatable packer section. The…
The invention relates to an assembly to be run with a well tubular having openings provided in the wall and for being arranged in a well bore and thereby forming a space between said tubing and the well bore surface. The assembly comprising: first fluid control means and second…
A tubular introduced into a wellbore is perforated at pre-selected locations after the tubular has been cemented into place. The locations of the perforations are determined by modeling inflow performance of a stimulation fluid within the formation. The inflow performance…
The invention relates to an assembly to be run with a well tubular having openings provided in the wall and for being arranged in a well bore and thereby forming a space between said tubing and the well bore surface. The assembly comprising: first fluid control means and second…
The invention relates to an assembly to be run with a well tubular having openings provided in the wall and for being arranged in a well bore and thereby forming a space between said tubing and the well bore surface. The assembly comprising: first fluid control means and second…
The invention relates to an assembly to be run with a well tubular having openings provided in the wall and for being arranged in a well bore and thereby forming a space between said tubing and the well bore surface. The assembly comprising: first fluid control means and second…
An assembly to be run within a well tubular includes a first fluid controller in a first section of the tubular and a second fluid controller in a second section of the well tubular. The assembly includes a set of packers for sealing of the space between the well tubular and a…
A method of cementing an off bottom liner comprising the steps of establishing a first flow blockage in the liner at a location down-hole of a cementing valve located in the side wall of the liner, opening the cementing valve which exposes openings in the sidewall of the liner,…
An assembly to be run in a well bore in conjunction with a perforated or a non perforated liner comprises an inflatable packer section prepared for being expanded by fluid, and valve means for opening and closing of fluid communication into the inflatable packer section. A fluid…
A method of cementing an off bottom liner comprising the steps of establishing a first flow blockage in the liner at a location down-hole of a cementing valve located in the side wall of the liner, opening the cementing valve which exposes openings in the sidewall of the liner,…
An assembly to be run in a well bore in conjunction with a perforated or a non perforated liner comprises an inflatable packer section prepared for being expanded by fluid, and valve means for opening and closing of fluid communication into the inflatable packer section. A fluid…