A flame supporting structure (3) is erected on an oil extraction platform (40) by use of a bipod (2) and a bridge (1). The bipod (2) and the bridge (1) are towed in a folded condition to the side of the platform (40) on floats (26) and ballast tanks (10). The tail (32) of the…
Assignee / Organization
Lecomte C
1Total Forward Citations
1Indexed Patents
1Avg Citations / Patent
1Portfolio H-Index