Embodiments of the invention are concerned with allocating resources to tasks and have particular application to situations where the availability of resources and the tasks to be performed change dynamically and the resources are mobile. When dealing with a mobile resource such…
Laithwaite Robert
In a method for scheduling tasks for a mobile resource, task schedule data for a mobile resource is accessed. The task schedule data comprises a scheduled location of the mobile resource, and the task schedule data is planned before initiation of the task. The task schedule data…
A plurality of resources, typically service operatives, are allocated to a plurality of tasks by a method in which initial information relating to the tasks to be allocated and the resources available to perform the tasks is provided to first generate an initial series of…
In order to optimise the utilisation of resources (e.g. technicians) in performing a number of jobs, each job is assigned a cost time-dependant function and each resource is assessed for the time at which it will be available. For each combination of jobs with resources an…
Tasks m such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area ( 2 ), are scheduled by means of a scheduler ( 10 ) at a work manager server ( 5 ). The…
Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The…
A system is described that has a first engine configured to determine an assignment of a resource to a task. The assignment is based on a schedule representation comprising at least resource profile data and task profile data. The resource profile data represents a resource…
Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The…
Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The…
Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by field engineers (E) are scheduled by running a scheduler (10) at a server (5) under a predetermined reference set of process conditions to provide schedule data corresponding to schedules…