Patents
JP 2002214254 A#3871475 Most Cited · 21 citations0.9/yr · PR 4.49ExpiredJP · Utility
Arrester type power transmission/distribution line current/voltage measuring apparatus and power transmission/distribution line current/voltage measuring system using the same

PROBLEM TO BE SOLVED: To provide an arrester type power transmission/distribution line current and voltage meter which can measure voltage and current of a power transmission/distribution line while allowing simple installation thereof at an arbitrary location with a simple work…

JP 2008141866 A#4479297 Most Cited · 19 citations1.1/yr · PR 3.99ActiveJP · Utility
Method of synchronizing time of transmission and distribution systems, and faulty point locating method and device using it

<P>PROBLEM TO BE SOLVED: To provide a method of synchronizing the time of transmission and distribution systems, which can perform accurate time synchronization between each substation and a key station, without using waves that have time information such as GPS, etc., and…

JP 2003284252 A#5279548 Most Cited · 17 citations0.7/yr · PR 3.24ExpiredJP · Utility
Power supply device for measuring apparatus of transmission/distribution system

<P>PROBLEM TO BE SOLVED: To provide a power supply device for measuring apparatus of transmission/ distribution system which dispenses with the necessity for insulating measures against high voltage, and is capable of taking out electricity from a transmission/distribution…

JP 2001157317 A#5740790 Most Cited · 16 citations0.6/yr · PR 3.06ExpiredJP · Utility
Assembling equipment management supporting system
Inventors: Harada Hiroyuki, Ishibashi MasahikoAssignee: Kyuki KkFiled 1999-11-19

PROBLEM TO BE SOLVED: To provide an assembling equipment management supporting system which can give and collect quickly item information concerning poles and aerial distribution equipment installed on the poles, without generating errors. SOLUTION: A non-contact IC card 3a is…

JP 2006047020 A#6745786 Most Cited · 14 citations0.7/yr · PR 3.22ExpiredJP · Utility
Phase sequence determination method for distribution line

<P>PROBLEM TO BE SOLVED: To provide a phase sequence determination method for a distribution line to facilitate its management. <P>SOLUTION: A master station and a plurality of slave stations located in a high-tension distribution system are provided. The master…

JP 2009150753 A#6739401 Most Cited · 14 citations0.8/yr · PR 3.25ActiveJP · Utility
Bypass tool for watt-hour meter

<P>PROBLEM TO BE SOLVED: To provide a bypass tool for a watt-hour meter enabling completion of a replacement work or a repair work of the watt-hour meter extremely quickly in a short time, while keeping an uninterruptible state, without requiring at all an…

JP 2003302479 A#7237995 Most Cited · 13 citations0.6/yr · PR 4.61ExpiredJP · Utility
Method and device for predicting wind velocity of tropical cyclone

<P>PROBLEM TO BE SOLVED: To provide a method and a device for predicting the wind velocity of a tropical cyclone while accurately taking regional characteristics of each of specific points into consideration without depending on experience or judgement by human.…

JP 2001196980 A#8381537 Most Cited · 12 citations0.5/yr · PR 2.37ExpiredJP · Utility
Method and system for retrieving and locating fault point of communication cable for wired distribution line remote supervisory control

PROBLEM TO BE SOLVED: To provide a method and a system for quickly retrieving and locating a permanent fault, or an intermittent fault or an irregular fault or the like where opening/reconnection of a cable is not required for retrieval and location of the fault point of a…

JP 2009033880 A#10109735 Most Cited · 10 citations0.6/yr · PR 2.58ActiveJP · Utility
Watt-hour meter having function for blocking electric power line communication signal

<P>PROBLEM TO BE SOLVED: To provide a watt-hour meter which dispenses with new space construction work for separately installing a blocking filter by assembling the blocking filter into the watt-hour meter, and can be connected with a communication device which transmits…

JP 2007074862 A#11294394 Most Cited · 9 citations0.5/yr · PR 2.53ExpiredJP · Utility
Remote controller and remote control system for power re-transmission

<P>PROBLEM TO BE SOLVED: To provide a power re-transmission remote controller and a power re-transmission remote control system that can stably transmit electricity required at the minimum for a life and that can be mounted compatibly on watt-hour meters having different…

JP 2003302478 A#12478248 Most Cited · 8 citations0.3/yr · PR 3.34ExpiredJP · Utility
Method of determining presence/absence of damage by tropical cyclone, tropical cyclone damage prediction method, and device therefor

<P>PROBLEM TO BE SOLVED: To provide a method of determining the presence/absence of damage by a tropical cyclone, a tropical cyclone damage prediction method, and a device for it, capable of determining the presence/absence of damage and predicting the scale of the damage…

JP 2005210818 A#12834080 Most Cited · 8 citations0.4/yr · PR 2.29ExpiredJP · Utility
Distribution line remote monitoring and controlling communication system applying internet protocol

<P>PROBLEM TO BE SOLVED: To provide a remote monitoring and controlling communication system capable of controlling a high-tension switch or measuring a current, a voltage, the power factor and the like of a high-tension distribution line without delaying the detection of…

JP 2005124297 A#19047699 Most Cited · 5 citations0.2/yr · PR 3.55ExpiredJP · Utility
Protective device for power grid, and protection relay arrangement using the same
Inventors: Tsuji Koichi, Kuribayashi HideyukiAssignee: Tsuji Koichi, Kyuki KkFiled 2003-10-16

<P>PROBLEM TO BE SOLVED: To provide a protective device for a power grid, for faster locating calculation speed of an accident point k. <P>SOLUTION: There are provided an advance calculation means 11 and a regular calculation means 13. The advance calculation means…

JP 2007006086 A#19374142 Most Cited · 5 citations0.3/yr · PR 2.17ExpiredJP · Utility
Power-line carrier communication device

<P>PROBLEM TO BE SOLVED: To provide a power-line carrier communication device capable of automatically setting an optimum communication path by easily discriminating the new installation of a terminal and the change of transmission characteristics, when the terminal is…

JP 2008008669 A#20348005 Most Cited · 5 citations0.3/yr · PR 1.60ActiveJP · Utility
Data collection system of electric power system at the time of accident

<P>PROBLEM TO BE SOLVED: To provide a data collection system of an electric power system at the time of accident, wherein even if a terminal station doesn't detect the accident, the master station collects the data for a certain period from all terminal stations, and…

JP 2009019236 A#20446111 Most Cited · 5 citations0.3/yr · PR 1.58ActiveJP · Utility
Water-vapor electrolysis cell unit

<P>PROBLEM TO BE SOLVED: To provide an electrolysis cell unit which shows adequate sealing properties in an middle temperature range of about 600°C, and can completely separate hydrogen and oxygen without causing problems such as "cracking" or "peeling" of…

JP 2003143747 A#23988987 Most Cited · 4 citations0.2/yr · PR 1.51ExpiredJP · Utility
Monitoring and protection method for power system, and program
Inventors: Tsuji Koichi, Kuribayashi HideyukiAssignee: Tsuji Koichi, Kyuki KkFiled 2001-11-02

PROBLEM TO BE SOLVED: To obtain a dynamic system protecting function following a change in the constitution of system. SOLUTION: The method includes a full-time monitoring program for detecting changes in the constitution of system and extracting a fixed matrix, and a protection…

JP 2006050079 A#23921449 Most Cited · 4 citations0.2/yr · PR 1.53ExpiredJP · Utility
Communication route control system in distribution line remote supervisory control communication system applied with ip

<P>PROBLEM TO BE SOLVED: To provide a communication route control system in a distribution line remote supervisory control communication system applied with an IP in which the communication route can be switched immediately without loading the protocol of STP, or the like.…

JP 2009010899 A#26478428 Most Cited · 4 citations0.2/yr · PR 1.20ActiveJP · Utility
Electric energy automatic metering system with information communication function

<P>PROBLEM TO BE SOLVED: To ensure security, reduce attenuation at a power line carrier communication, and make an electric energy automatic metering system with information communication function easy to introduce to collective dwelling with respect to the electric energy…

JP 2002032888 A#28348828 Most Cited · 3 citations0.1/yr · PR 1.55ExpiredJP · Utility
Measuring instrument information recognizing device and measuring instrument information totalizing system and method therefor

PROBLEM TO BE SOLVED: To provide a measuring instrument information recognizing device, a measuring instrument information totalizing system and a method therefor capable of clearly reading characters and figures by preventing cameras themselves from being reflected on the…

JP 2003043093 A#29196981 Most Cited · 3 citations0.1/yr · PR 1.34ExpiredJP · Utility
Portable trouble point survey instrument and trouble point surveying method

PROBLEM TO BE SOLVED: To provide a portable survey instrument with a low power capacity which is capable of surveying a trouble point on a high voltage overhead power distribution line at a high surveying efficiency and also applying a high voltage enough for burning, and…

JP 2008139145 A#42784592 Most Cited · 2 citations0.1/yr · PR 0.95ActiveJP · Utility
Method for calculating surge propagation velocity in fault location system

<P>PROBLEM TO BE SOLVED: To provide a surge propagation velocity calculation method in a fault location system capable of calculating a propagation velocity of a surge waveform, at the time of a fault in an early stage with high precision. <P>SOLUTION: Switching…

JP 2002048826 A#46890013 Most Cited · 1 citations0.0/yr · PR 1.04ExpiredJP · Utility
Input converting unit with built-in test terminal
Inventors: Kikuchi Toru, Kitajima Takeshi, Yuasa Maki, Okuno YujiAssignee: Kyuki KkFiled 2000-08-01

PROBLEM TO BE SOLVED: To provide an input converting unit with a built-in test terminal capable of achieving the compactness of a protective control cabinet or improving its space efficiency. SOLUTION: The input converting unit 2 is constituted of an outer box 3, inner boxes 4a…

JP 2004218322 A#81587638 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredJP · Utility
Water tunnel electric inspection vehicle

<P>PROBLEM TO BE SOLVED: To provide a water tunnel electric inspection vehicle capable of being traveled even in a place having the depth of water deeper than a position getting in a vehicle of a sitting attitude in the water tunnel electric inspection vehicle used as a…

JP 2005292955 A#138032500 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredJP · Utility
Alternating voltage regulator
Inventors: Miyazaki Osamu, Torikai TakayukiAssignee: Kyuki KkFiled 2004-03-31

<P>PROBLEM TO BE SOLVED: To provide a single-tap alternating voltage regulator that has a compact and light protection circuit for high voltage suppression and maintains a short circuit between shunt windings even when all the switches are opened. <P>SOLUTION: The…