The complex comprises of the Mesta Dam (1) with a new dam site for building a dam; sub-dam-site Mesta Hydroelectric Power Plant (2); Pumping Transportation Supply Canal, connecting the Mesta Dam (1) with the Yadenitsa Dam (5), consisting of three pumping stations (3, 4 and 6)…
Assignee / Organization
Kukov
2Total Forward Citations
11Indexed Patents
0Avg Citations / Patent
1Portfolio H-Index
The transport gravitational tunnel connection is used in hydraulic engineering and has been made between the Chaira (1) reservoir and the Stankovi Baraki reservoir (2) as part of the Mesta water supply Hydroelectric complex. It comprises the following hydraulic engineering…