PROBLEM TO BE SOLVED: To facilitate construction, reduce the construction cost, and prevent a covering block from being influenced by settling of banking by making plate- like block wall surface materials slidably overlap each other without abutting to be connected to an anchor.…
Kre Engineers Kk
PROBLEM TO BE SOLVED: To improve the working performance of inserted rods and the thickness control of a filling layer and also to enhance the stability of a fill in a direction perpendicular to a reinforcing strip by drilling holes at constant intervals in the reinforcing…
PROBLEM TO BE SOLVED: To facilitate the underwater execution of a reinforcement material by installing a mattress-cage, a gabion or a cage frame in which the reinforcement material for reinforcement earth is built in on a lower surface, and executing the banking work with sandy…
PROBLEM TO BE SOLVED: To facilitate the underwater execution of a reinforcement material by executing the reinforcement soil method in the back-fill sediment to be filled behind sheet piles. SOLUTION: After executing sheet piles 1, guide piles 7 are driven on the back side…
PROBLEM TO BE SOLVED: To provide a method for more easily constructing a reinforcing banking body having a vertical wall or a steeply inclined wall by using cement- improved soil without using conventional blocks and other wall surface members, for the method of constructing…
PROBLEM TO BE SOLVED: To execute the covering of a vertical reinforced earth banking easily and inexpensively by providing a slide joint to be used both as a coupling fitting between upper and lower plate-like wall surface materials and as a coupling for an anchor. SOLUTION: A…