PROBLEM TO BE SOLVED: To prevent the contamination of a duct or the like with gas to be cleaned containing dust, a malodorous component and a harmful component. SOLUTION: The inner space of a housing 1 is partitioned into a lower first chamber 4 and an upper second chamber 5 by…
Kanken Kk
PROBLEM TO BE SOLVED: To provide a sediment disaster detection system capable of promptly detecting a sediment disaster (an abnormality in a slope face) by sensing an abnormal state of an installation foundation of a water channel block.SOLUTION: A sediment disaster detection…
PURPOSE:To produce a soil activator which comprises a variety of Chinese medical herbs having antibacterial, anti-pathogenic insect and pest-repellent activities, and can attain control of plant diseases and repelling of injurious animals, and increase the intrinsic metabolism…
PURPOSE: To clean effectively waste water containing blood, meat pieces, internal organs and the like by mixing ferric chloride and/or polymer-modified ferric chloride and aluminum sulfate and blending active carbon, zeolite or fly ash and a polymer ion surface active agent all…
PROBLEM TO BE SOLVED: To promote the growth of a turf and grasses from water-permeable base vegetation surfaces exposed among imitation stones made of concrete by the vegetation action of water-permeable concrete bases while effectively attaining the object of complete lining on…
PURPOSE: To rapidly advance the separation of cutting oil due to colloid flocculation extremely improve the separation capacity and obviate the post treatment by specifying a compsn. of flocculation active components. CONSTITUTION: A cutting oil flocculating treatment agent has…
PROBLEM TO BE SOLVED: To provide a joint cut-off structure which can reduce the time required for construction work, reduce the displacement of a side ditch due to earthquake, and obtain sufficient cut-off effect. SOLUTION: A joint cut-off structure of a side ditch seals a joint…
PROBLEM TO BE SOLVED: To lessen the number of the parts of a block joining member, simplify structure, facilitate joining working while an inexpensive joining tool is used to attain expected joining purpose, shorten working hours and attain cost reduction. SOLUTION: An insert…
<P>PROBLEM TO BE SOLVED: To provide a concrete floor structure which is formed by laying a plurality of PC concrete plates, wherein the width and alignment of a drain ditch defined between the PC concrete plates in a longitudinal direction and a lateral direction are…
PURPOSE: To obtain a soil-hardening agent for stably hardening organic soil, capable of reaction similar to that for an inorganic object and also capable of sealing in the offensive odor and various toxic substances existing in the object and preventing them from leaching out…
PURPOSE: To provide hydrophobic flocculant excellent in dehydration cohesive ness and the separation capacity of a solid. CONSTITUTION: A hydrophobic flocculant has a compsn. consisting of at least 10-25wt.% of iron sulfate, 5-15wt.% of sodium sulfate, 20-40wt.% of polyaluminum…
PURPOSE: To provide hydrophobic flocculant excellent in dehydration cohesiveness and the separation capacity of a solid. CONSTITUTION: A hydrophobic flocculant is composed of an aq. soln. of a compsn. consisting of at least 2-15wt.% of ferric sulfate, 5-15wt.% of sodium sulfate,…
PROBLEM TO BE SOLVED: To provide a concrete wall or a building material block and a purifying cement which impart a soil rearing function (vegetative function) or a river protective function (purifying function) while exhibiting a function as a covering material for the natural…
PROBLEM TO BE SOLVED: To provide a channel gate capable of lightening labor required for opening a gate for discharging water in the openable gate set in a channel and for damming water flowing in the channel. SOLUTION: An openable window 11 swinging up and down is provided to…
<P>PROBLEM TO BE SOLVED: To provide the fitting structure of a side ditch body and a side-ditch cover in which a tilting displacement in the breadthwise direction of the side-ditch cover and the danger of a falling and a movement displacement in the longitudinal direction…
<P>PROBLEM TO BE SOLVED: To provide a PC (precast) concrete foundation plate for an underground buried septic tank considerably reducing a construction period and a construction cost of septic tank burying work and attaining labor saving and uniformization of the burying…
PROBLEM TO BE SOLVED: To provide a method capable of easily and properly adjusting a level of a new side ditch cover, when repairing a side ditch cover.SOLUTION: In a repair method of the side ditch cover supported by a left cover receiving part and a right cover receiving part…
PROBLEM TO BE SOLVED: To improve benefit.SOLUTION: An extension module 20 is installed on an unused ground between solar cell arrays 10 and 10' arranged at a predetermined interval so that the extension module is close to the inclination lower end edge side of the solar cell…
PROBLEM TO BE SOLVED: To improve appearance by providing hidden joint grooves, disappearing into the bottom part of an imitation stone group, around the base part of the imitation stone group, and providing similar joints at the joint groove bottom parts between the imitation…
PROBLEM TO BE SOLVED: To contrive to hide sectional joint patterns with a pseudo stone projected edge area and enhance a near natural view by shaping the surface of a base with pseudo stone groups cubically and projecting the end of pseudo stone blocks along the outside surface…
PROBLEM TO BE SOLVED: To facilitate installation, and improve operability by installing a weir on a groove cover installed in a side ditch so as to be openable/closable. SOLUTION: A winding drum 3 for constituting a winder is installed on the reverse side of a lattice-shaped…
PROBLEM TO BE SOLVED: To provide the adaptability for reducing size and weight of a block constituting a gutter and setting its width, improve the workability of gutter construction work, reduce a storage space and a transportation space, improve the strength against earth…
<P>PROBLEM TO BE SOLVED: To provide a Chinese preparation hardly causing injury to human beings and environmental disruption after fertilization by introducing the consideration of a Chinese medicine to a plant, and to provide a method for suppressing germination and…
<P>PROBLEM TO BE SOLVED: To provide a retaining wall wherein a favorable environmental watering place function for kingfishers, pied king fishers, druse swallows, etc. is added to the retaining wall by making use of a retaining wall formed by piling up laying blocks.…
<P>PROBLEM TO BE SOLVED: To provide a nesting environment for birds which induces nesting by boring nest tunnels from the opening on a retaining wall, continuously into the depth, in e.g., common kingfisher, pied kingfisher, bank swallow, or the like, which form nests by…