The present invention relates to a protector structure for an underground continuous wall rebar lap splice. According to the present invention, the protector structure is inserted into an excavation unit excavated downward for building an underground continuous wall forming an…
Ju Hyung Sin
The present invention relates to a structure of an underground continuous wall and an underground continuous wall construction method. In the underground continuous wall, a preceding panel and a following panel are sequentially formed. When constructing the preceding panel,…
The present invention relates to a preceding wire mesh assembly used for a slurry wall. The preceding wire mesh assembly according to the present invention, which is included in a preceding panel of a slurry wall of a building in which the preceding panel and a succeeding panel…
The present invention relates to an underground slurry wall, a construction method of an underground slurry wall and a reinforced structure used for the same. The reinforced structure according to the present invention is installed between a preceding panel and a following panel…
The present invention relates to a protector structure for a reinforcing bar lap splice of an underground continuous wall. According to the present invention, the protector structure is inserted into an excavation part excavated downwards to build an underground continuous wall…
The present invention relates to a structure of an underground slurry wall and a construction method of an underground slurry wall. In an underground slurry wall, a preceding panel and a following panel are sequentially formed, and the underground slurry wall caused a problem…
The present invention relates to a structure of an underground slurry wall and a construction method of an underground slurry wall. In an underground slurry wall, a preceding panel and a following panel are sequentially formed. When constructing the preceding panel, blocking…
The present invention relates to a structure of an underground continuous wall and an underground continuous wall construction method. In the underground continuous wall, a preceding panel and a following panel are sequentially formed. When constructing the preceding panel,…
The present invention relates to a structure of an underground continuous wall and an underground continuous wall construction method thereof. The underground continuous wall sequentially forms a preceding panel and a following panel. To construct the preceding panel, blocking…
The present invention relates to a structure of an underground slurry wall and a construction method for an underground slurry wall. In an underground slurry wall, a preceding panel and a following panel are sequentially formed, and the underground slurry wall caused a problem…
The present invention relates to a protector structure for lapped splices in a slurry wall. The protector structure, which is inserted into an excavated portion excavated downward to construct a slurry wall for forming the outer wall of basement floor of a building by the…
The present invention relates to a protector structure for lap joint of reinforcing bars of a slurry wall. According to the present invention, the protector structure is inserted into an excavation unit excavated downward to build a slurry wall having an outer wall body in a…
The present invention relates to a protector structure for lap splice in reinforcing bars in an underground continuous wall. The protector structure according to the present invention is inserted into an excavation part excavated downward to build an underground continuous wall…
The present invention relates to a protector structure for lapping of steel bars in a slurry wall, which can improve the structural strength of the wall. According to the present invention, the protector structure, which is inserted into an excavation unit excavated downward for…