CN 101,054,799 A#4822740 Most Cited · 18 citations0.9/yr · PR 3.92ActiveCN · Utility
Post-grouting construction method for long helical bore grouting pile and its grouting device
Inventors: Yang Shenggui YaoAssignee: Jianyan Foundation EngineeringFiled 2007-01-12

A long auger hole grouted pile post-grouting processing method and the postposition grouting device, which has the following step: firstly, the postposition grouting device is made; then, the long earth auger is used to drill; the plain concrete is pumped into the hole of the…

CN 1,528,988 A#24634533 Most Cited · 4 citations0.2/yr · PR 1.40ExpiredCN · Utility
Long spiral drilling and concrete pumping pile-forming rear-insertion reinforcement cage construction process and reinforcement cage guiding device
Inventors: Wu Chunlin, Teng Yanjing, Liu GuoanAssignee: Jianyan Foundation EngineeringFiled 2003-10-20

A long spiral drilling pumping concrete pile-forming post-inserting reinforcement cage construction process and a reinforcement cage guiding device are disclosed, wherein the construction process comprises the following steps: firstly, drilling a hole; then filling plain…

CN 100,476,082 C#92345169 Most Cited · 0 citations0.0/yr · PR 0.56ActiveCN · Utility
Post-grouting construction method for long helical bore grouting pile and grouting device thereof
Inventors: Shenggui Yang, Zhiquan Yao, Mingli Yan, Chunlin WuAssignee: Jianyan Foundation EngineeringFiled 2007-01-12 · Granted 2009-04-08

A long auger hole grouted pile post-grouting processing method and the postposition grouting device, which has the following step: firstly, the postposition grouting device is made; then, the long earth auger is used to drill; the plain concrete is pumped into the hole of the…

CN 1,232,705 C#147211570 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredCN · Utility
Long spiral drilling and concrete pumping pile-forming rear-insertion reinforcement cage construction process and reinforcement cage guiding device
Inventors: Wu Chunlin TengAssignee: Jianyan Foundation EngineeringFiled 2003-10-20 · Granted 2005-12-21

A long spiral drilling pumping concrete pile-forming post-inserting reinforcement cage construction process and a reinforcement cage guiding device are disclosed, wherein the construction process comprises the following steps: firstly, drilling a hole; then filling plain…