The equipment is designed for simultaneous determination of the time required to achieve given settling values and the settling values obtained after given time intervals. Pref. the settling operating is also recorded against time. The equipment pref. comprises a clock started…
Assignee / Organization
Jansen Helmut Dr
12Total Forward Citations
9Indexed Patents
1Avg Citations / Patent
3Portfolio H-Index
To ensure that water stored in a flushing cistern (1) on a water closet is fully replaced promptly after use, provision is made for doubling the water outflow system. A second outflow opening (8) is sited close to the first, and has a valve for closure. It is sited at the point…