<P>PROBLEM TO BE SOLVED: To provide a micro heat exchanger having high heat transfer performance by improving a leakage and positioning accuracy in fixing a large number of small-diameter tubes to header parts and further improving tube strength, and to provide a…
Iwamoto Kk
PROBLEM TO BE SOLVED: To efficiently and smoothly perform carbonization treatment of a treated product by improving the inner structure of a carbonization furnace in the carbonization furnace.SOLUTION: The treating material supplied from a supply portion 29 to a treatment…
<P>PROBLEM TO BE SOLVED: To provide a small and high performance heat recovery apparatus recovering heat of an internal combustion engine. <P>SOLUTION: A plurality of flat tubes (32) formed as tubes having notches (34, 35) by linearly cutting upper and lower parts…
<P>PROBLEM TO BE SOLVED: To provide an assembly house which is easy in handling, does not necessitate a wide space for storage of a wall unit and is capable of enhancing a transfer efficiency of a truck. <P>SOLUTION: In an assembly house of the present invention,…
<P>PROBLEM TO BE SOLVED: To reduce the size and weight of a heat exchanger and improve the assembly property of the heat exchanger. <P>SOLUTION: A stainless sheet of a thickness of 0.1 mm is bent or otherwise to form a heat exchanger tube 30 in which a middle portion…
PROBLEM TO BE SOLVED: To provide a health apparatus having a multifunctional characteristic providing simultaneously synergistic effects such as a thermotherapeutic effect, a magnetic effect and an acupressure effect by various radiation plates and easily providing an effect…
<P>PROBLEM TO BE SOLVED: To provide bedding with temperature adjustment function which can exhibit an efficient temperature adjustment function and enables a user to get comfortable and pleasant sleep. <P>SOLUTION: The bedding with temperature adjustment function (a…
PROBLEM TO BE SOLVED: To provide a waste treatment machine equipped with an incinerator efficiently treating waste of high moisture content or waste treatable only at high temperature.SOLUTION: The waste treatment machine is provided with a heating bed 3 for waste combustion, in…
<P>PROBLEM TO BE SOLVED: To provide a warm stone bath apparatus obtaining an effective dietary effect. <P>SOLUTION: The warm stone bath apparatus is equipped with: the laid stone bed 2 arranged to a warm stone bathing apparatus main body A1 and allowing a user M to…
PURPOSE:To simplify the works of constructing a structure with stone columns and stone walls, shorten the construction period, and suppress the costs for executing the works by mass-producing columns and walls at a plant, and assembling them at the construction site through…
<P>PROBLEM TO BE SOLVED: To provide a sleep inducing device which enables a person going to sleep to fall asleep naturally and reliably in a short time and to sleep in the same favorite posture as usual without disturbance in going to sleep. <P>SOLUTION: The device…
PROBLEM TO BE SOLVED: To provide an implement which reduces a chemical substance in a fossil fuel and an exhaust gas, and efficiently generates high temperature combustion heat in a heating chamber in an outer cylinder in a predetermined horizontal type carbonization furnace or…
PURPOSE:To unify plate stone and concrete without using concrete forms. CONSTITUTION:Plate stone 1 is stacked at multistages while holding a specified inclination by connecting plate stone 1 and a landslide protection wall fencing 2 by reinforcements 11, 13. Concrete 14 is…
PURPOSE: To simply, speedily and safely execute a retaining wall wherein the angle of inclination is large, changes on the way of the execution of the work. CONSTITUTION: A steel framed jig is constituted of a base member 2 with a plurality of mounting holes 8, an arm member 3…
PROBLEM TO BE SOLVED: To provide a stone wall panel which is light in the weight and allows easy execution of works, by piling up a plurality of plate stone materials in a wall form to form a stone block, and laying a group of such stone blocks in front of a support framing…
PROBLEM TO BE SOLVED: To provide a mounting material for a building or a civil-engineering site, in which assembly is simplified, is facilitated and is safety and operating efficiency is improved, and its installation structure. SOLUTION: A metal fitting 2 for a latch is…
<P>PROBLEM TO BE SOLVED: To provide an assembly house capable of being used as a building for a general house or the like which requires no complicated work, easily expedites the work, shortens the construction period, and reduces the construction cost by forming a…
<P>PROBLEM TO BE SOLVED: To reduce the size and weight of a heat exchanger, and to improve heat exchange efficiency and the assembling efficiency of the heat exchanger. <P>SOLUTION: A plurality of tubes 30 are formed as a flat hollow pipe having a section 0.5 mm or…
PURPOSE:To shorten the period of construction as well as reduce cost of construction greatly by using low-cost materials by effectively utilizing stone material without loss. CONSTITUTION:A through hole 4 is formed in the central part of a round or angular column-shaped stone…
PURPOSE:To obtain a construction method which makes short a construction period and reduces construction costs greatly and makes it possible to use safe and large thin flat stones. CONSTITUTION:After reinforcing steel rods 2 are jointed to a concrete foundation 1 and processed…
PROBLEM TO BE SOLVED: To manufacture an exterior facing panel, in which an exterior-facing member group, in which a plurality of undefined exterior facing members are superposed in a multistage shape and a wall shape, are arranged and fixed onto the surface of a support frame…
<P>PROBLEM TO BE SOLVED: To provide a fabricated house capable of being simply and quickly assembled at a construction site even if its size is increased, shortening a construction period and, at the same time, greatly reducing also a construction cost. <P>SOLUTION:…
PROBLEM TO BE SOLVED: To provide a panel for building of cheap, light and strong and having easiness in construction and dismantlement of the building.SOLUTION: The building panels 1a-1i constructs all or a part of a building having wall material surrounding periphery and roof…
PURPOSE:To contrive walls to be constructed with thin stone sheets not to be broken due to the pressure of concrete. CONSTITUTION:Reinforcements 2 are combined with a concrete foundation 1, and thin stone sheets 3, 3 are arranged to be confronted with each other at specified…
PURPOSE:To firmly integrate a stone plate and concrete. CONSTITUTION:A diagonal reinforcement 2 is attached to a concrete foundation 1, and an anchor bolt 4 is attached to the inside of a stone plate 3, which is erected on the concrete foundation 1, and one end of a…