A prestressed concrete girder having an adjustable load bearing capacity includes a concrete girder including an upper flange, and at least one non-attached steel wire installed in the upper flange of the girder and extending in a lengthwise direction of the girder. A method of…
Interconstec Co Ltd
PURPOSE: A two-segmented arch structure and a construction method thereof are provided to increase structural efficiency of a crown joint fixed connection, improve workability and construct the two-segmented arch structure at a low cost. CONSTITUTION: A 2-segmented arch…
Provided are segments of a spliced prestressed concrete girder, which have improved structural integrity at joints, and a method of manufacturing the segments. The method of manufacturing the segments, which are combined to build the spliced prestressed concrete girder,…
There is provided a method of manufacturing a segment which is used to build a spliced prestressed concrete girder by combining a plurality of the segments, the method comprising: manufacturing one or more joint blocks, each having a first end that has a shear key and is to be…
본 발명은 분절 프리스트레스 콘크리트(Prestressed Concrete, PSC) 거더의 세그먼트 및 그 제조방법에 관한 것으로, 특히 접합부에서 발생하는 구조적 취약성이 개선된 분절 프리스트레스 콘크리트 거더의 세그먼트 및 그 제조방법에 관한 것이다. 본 발명은 서로 연결되어 분절 프리스트레스 콘크리트 거더를 형성하는 세그먼트의 제조방법에 있어서, 일단부는 다른 세그먼트의 단부와 접합되기 위한 전단키를 가지며, 타단부는 세그먼트본체와 접합될 접합블록을 제작하는 단계; 및 상기 접합블록을…
In a method for designing a multi-step tension prestressed girder, prestress is appropriately introduced with respect to a relationship between a load and stress, for each step of construction, so that the height of a profile of the girder can be reduced. In a method for…
PURPOSE: A steel box composite girder using precast concrete used for a continuous bridge and a manufacturing method thereof are provided to reduce the weight of the composite girder by using structurally-efficient high-strength concrete instead on low-strength concrete.…
PURPOSE: A beam launching method using an end strut in which a roller guide unit is installed is provided to enable to regulate the simplified installation of angles at the front and rear end of the strut on the spot and to launch a cast truss more stably and efficiently.…
PURPOSE: A beam launcher with an anchorage system for constructing a bridge is provided to prevent the beam launcher from slipping when the beam launcher is moved and stopped depending on the longitudinal slope of a bridge. CONSTITUTION: A beam launcher with an anchorage system…
본 발명은 시공성, 연결접합부의 안정성 및 경제성을 확보할 수 있는 프리캐스트 세그먼트 단부의 양 외부측면 및 상면에 각각 형성된 블럭아웃부의 단부내면에 정착구멍이 형성된 연결접합부; 및 상기 정착구멍과 다른 프리캐스트 세그먼트의 정착구멍을 관통하여 조여지면서 프리캐스트 세그먼트의 연결접합부를 접합시키는 정착장치;를 포함하는 PSC 거더교 시공방법에 관한 것이다.
PURPOSE: A segmental prestressed concrete box beam and a joint method thereof are provided to prevent the total compressive stress of concrete joined to a space retainer from exceeding allowable compressive stress. CONSTITUTION: A joint method of a segmental prestressed concrete…
PURPOSE: A method for constructing a prestressed concrete bulb T-girder bridge is provided to solve the problems of chambers generated differently in girders and to easily apply it to a bridge of low height. CONSTITUTION: A method for constructing a prestressed concrete bulb…
The present invention relates to a wind tunnel slab applied to a ceiling portion of a tunnel and a method of manufacturing such wind tunnel slab, and particularly, configured to integrally compose a steel slab and a concrete slab to form a slab, and eliminate the fear of…
Provided is a temporary fixing system for a PSC spliced girder bridge. According to one embodiment, the temporary fixing system used during construction of the PSC spliced girder bridge includes: a pier; a pier girder arranged on the pier; a pier upper transverse beam arranged…
The present invention relates to a prestressed concrete girder system used to construct a prestressed concrete (PSC) spliced girder bridge comprises: a girder segment body; and a first prestressing unit. The present invention provides a construction method of a new spliced…
A connecting method for segments of a spliced prestressed concrete girder is provided to prevent the connection unit from being structurally fragile according to the attachment of the band-type structural reinforcing material made of the FRP(Fiber Reinforced Plastics). A…
PURPOSE: A mold assembly for a pretension concrete member as one unit with a reaction force holder for pretension of a tendon, and a manufacturing method of the same are provided to manufacture a pretension precast concrete member without a large-scaled manufacturing field by…
A tension force adjustable prestressed girder is disclosed which can compensate for sagging or cracks of a girder generated due to overload or long-term creep or increase a load-resisting force of a bridge or a building. The tension force adjustable prestressed girder for…
A prestressed concrete girder (20) has an adjustable load bearing capacity so that the tension of a steel wire (26, 27, 29) is adjusted as necessary. The prestressed concrete girder having an adjustable load bearing capacity in a bridge includes at least one non-attached steel…
In a method for designing a multi-step tension prestressed girder, prestress is appropriately introduced with respect to a relationship between a load and stress, for each step of construction, so that the height of a profile of the girder (21) can be reduced.
There is provided a method of manufacturing a segment which is used to build a spliced prestressed concrete girder by combining a plurality of the segments, the method comprising: manufacturing one or more joint blocks, each having a first end that has a shear key and is to be…
In a method for designing a multi-step tension prestressed girder, prestress is appropriately introduced with respect to a relationship between a load and stress, for each step of construction, so that the height of a profile of the girder can be reduced.
An embodiment of the present invention has an object to provide a construction method of a cut-and-cover underground structure which can easily construct a underground structure by forming upper and lower members of the underground structure with precast concrete and…
A concrete Rahmen bridge according to the present invention comprises: a pair of lower plate units (100) formed after being spaced apart; wall body units (200) each of which is formed at an upper portion of the lower plate units (100); and a slab unit (300) formed such that both…
PURPOSE: An incrementally prestressed girder designing method and a girder manufacturing method are provided to increase the load carrying capacity of the existing bridge and to regulate tensile force for supplementing the deflection and cracks of a bridge caused by excessive…