There is provided a process for producing precast concrete parts, in particular pylon segments. Concrete is poured into a casting mold with a planar bottom for producing a planar underside. After the concrete has reached at least a minimum strength an equalization layer is…
Holscher Norbert
The present invention concerns a lifting apparatus, in particular a cross lifting beam, for lifting a first pylon segment of a concrete pylon of a wind power installation by means of a crane, including at least one fixing means for fixing the pylon segment to the lifting…
A wind power plant tower segment is provided. The tower segment is designed as a jacket segment and comprises a reinforced concrete body, comprising two faces for attaching to faces of at least one further tower segment. In the region of each face, at least one connecting body…
There is provided a process for producing precast concrete parts, in particular pylon segments. Concrete is poured into a casting mold with a planar bottom for producing a planar underside. After the concrete has reached at least a minimum strength an equalization layer is…
The present invention concerns a lifting apparatus, in particular a cross lifting beam, for lifting a first pylon segment of a concrete pylon of a wind power installation by means of a crane, including at least one fixing means for fixing the pylon segment to the lifting…