A control system for a well site, the well site includes connectable elements configured for inserting down a well. An explosion hazard zone surrounds the well site. A first electronics enclosure is remote from the explosion hazard zone and houses a first electronics module. A…
Hickman Don Darrell
A method of making an open-head power tong assembly includes the steps of providing a power tong assembly that has a first case assembly and a transmission assemble. A second case assembly is provided that includes a casing having a sidewall with a plurality of supporting ribs,…
A tong assembly includes a case assembly and a tong head assembly disposed in the interior of the case assembly and adapted to engage a first sucker rod. A transmission assembly engaged to a hydraulic motor and including a backup tong assembly. The backup tong assembly includes…
A control system for a well site, the well site includes connectable elements configured for inserting down a well. An explosion hazard zone surrounds the well site. A first electronics enclosure is remote from the explosion hazard zone and houses a first electronics module. A…
A tong assembly includes a case assembly having an enclosure defining an interior. A bearing assembly is disposed in the interior of the enclosure. The bearing assembly includes a first bearing member defining a first cavity and a second bearing member defining a first cavity. A…
A method and system certifies a joint between a first threaded element having a first shoulder and a second threaded element having a second shoulder and the equipment used to tighten the connection. The method tightens to a first position at which the first shoulder abuts the…
A pressure accumulator control system for a blowout preventer includes a programmed logic control, a plurality of remote valves and a pressure monitoring and recording system. The control system monitors: accumulator pressure; valve manifold regulated pressure; annular regulated…
A system for monitoring loads at well drilling and service operations includes a digital user interface. The digital interface is in electronic communication with a first pressure transducer in fluid communication with a first pad type hydraulic load sensor, a second pressure…
A bearing is for a tong including a housing and an engagement assembly. The bearing has a monolithic upper bearing element having a substantially planar upper surface and a monolithic lower bearing element having a substantially planar lower surface. The upper and lower bearing…
A method of making an open-head power tong assembly includes the steps of providing a power tong assembly that has a first case assembly and a transmission assemble. A second case assembly is provided that includes a casing having a sidewall with a plurality of supporting ribs,…
A tong assembly includes a case assembly having an enclosure defining an interior. A bearing assembly is disposed in the interior of the enclosure. The bearing assembly includes a first bearing member defining a first cavity and a second bearing member defining a first cavity. A…
A renewable bearing is for a tong including a housing and an engagement assembly. The bearing has a monolithic upper bearing element having a substantially planar upper surface and a monolithic lower bearing element having a substantially planar lower surface. The upper and…
A system for monitoring loads at well drilling and service operations includes a digital user interface. The digital interface is in electronic communication with a first pressure transducer in fluid communication with a first pad type hydraulic load sensor, a second pressure…
A method and system certifies a joint between a first threaded element having a first shoulder and a second threaded element having a second shoulder and the equipment used to tighten the connection. The method tightens to a first position at which the first shoulder abuts the…
A control system for a well site, the well site includes connectable elements configured for inserting down a well. An explosion hazard zone surrounds the well site. A first electronics enclosure is remote from the explosion hazard zone and houses a first electronics module. A…
A renewable bearing is for a tong including a housing and an engagement assembly. The bearing has a monolithic upper bearing element having a substantially planar upper surface and a monolithic lower bearing element having a substantially planar lower surface. The upper and…
A method and system certifies a joint between a first threaded element having a first shoulder and a second threaded element having a second shoulder and the equipment used to tighten the connection. The method tightens to a first position at which the first shoulder abuts the…
A renewable bearing is for a tong including a housing and an engagement assembly. The bearing has a monolithic upper bearing element having a substantially planar upper surface and a monolithic lower bearing element having a substantially planar lower surface. The upper and…
A renewable bearing is for a tong including a housing and an engagement assembly. The bearing has a monolithic upper bearing element having a substantially planar upper surface and a monolithic lower bearing element having a substantially planar lower surface. The upper and…