Patents
Assignee / Organization

Hess Joe E.

92Total Forward Citations
4Indexed Patents
23Avg Citations / Patent
4Portfolio H-Index
US 2003221834 A1#1408950 Most Cited · 40 citations1.7/yr · PR 4.78PendingUS · Application
Systems and methods for controlling flow and access in multilateral completions
Inventors: Hess Joe E, Smith Benji LAssignee: Hess Joe E., Smith Benji L.Filed 2002-06-04

Systems and methods for controlling flow and access in multilateral completions provide for controlling rates of flow from intersecting wellbores. In a described embodiment, flow from a branch wellbore and flow from a lower parent wellbore are controlled by respective remotely…

US 2012145463 A1#2434248 Most Cited · 29 citations2.1/yr · PR 3.31PendingUS · Application
Methods and apparatus for drilling, completing and configuring u-tube boreholes

A borehole network including first and second end surface locations and at least one intermediate surface location interconnected by a subterranean path, and a method for connecting a subterranean path between a first borehole including a directional section and a second…

US 8,272,447 B2#8708450 Most Cited · 12 citations0.9/yr · PR 1.55ActiveUS · Utility
Methods and apparatus for drilling, completing and configuring U-tube boreholes
Inventors: Lee Dean, Hay Richard Thomas, Gil Nestor Humberto, Tebbutt Kyler, Schnell Rodney AAssignee: Lee Dean, Hay Richard ThomasFiled 2011-12-15 · Granted 2012-09-25

A borehole network including first and second end surface locations and at least one intermediate surface location interconnected by a subterranean path, and a method for connecting a subterranean path between a first borehole including a directional section and a second…

US 8,146,685 B2#9613408 Most Cited · 11 citations0.8/yr · PR 1.76ActiveUS · Utility
Methods and apparatus for drilling, completing and configuring U-tube boreholes
Inventors: Lee Dean, Hay Richard Thomas, Gil Nesto Humberto, Tebbutt Kyler, Schnell Rodney AAssignee: Lee Dean, Hay Richard ThomasFiled 2011-01-10 · Granted 2012-04-03

A borehole network including first and second end surface locations and at least one intermediate surface location interconnected by a subterranean path, and a method for connecting a subterranean path between a first borehole including a directional section and a second…