A vessel (10) is provided for installing or removing a module (16) on or from a support structure (30) erected in a body of water. The vessel is able to suspend the module over the support structure by cranes (14, 15), enabling installation or removal of the module to be…
Heerema Engineering
A tower structure having a central column, three support legs and a base structure which can be anchored to the sea bed by means of piles. The legs and base structure are constructed as an integral preformed base unit with a sleeve attached to the upper ends of the legs. The…
A vessel for installing and removing a deck module (16) on or from a platform jacket (75) with guides (24) is U-shaped, having an opening within which the platform jacket is located, and movable strut assemblies (50) on either side (12, 13) of the opening to support the module…
A method of controlling the vertical position of a body in water, where the body has or is given a positive buoyancy, providing a structure which is of sufficient weight to give the body negative buoyancy, providing a structure which is separate from the body and from which to…
An internal elevator for lifting a pipe or pile (11) comprises a plurality of gripper assemblies (14) which are radially movable into engagement with the interior wall of the pipe or pile. A ram (13) controls relative axial movement of first and second body members (12a, 12b)…
A semi-submersible crane vessel has a chamber (3) which is open to the sea at the bottom. A piston (4) is movable up and down in the chamber by means of hydraulic jacks (5 and 6) acting on piston rod (7). The part (10) of the chamber above the piston contains air, which may be…
A vessel (10) for installing or removing a deck module (16) on or from a platform structure with guides (24) is U-shaped, having an opening (11) within which the platform structure is located, and a bank of cranes (14, 15) on either side (12, 13) of the opening for suspending…
The invention provides an offshore tower structure comprising a base structure for positioning on the sea bed, a central enclosed tubular column 20 containing services such as conductors and risers and extending from the base structure to above the water level, in use, for…
A hoisting device comprises a cable (12) controlled at one end by a conventional crane winch assembly (14) and at the other end by a traction winch assembly comprising traction device (15) and storage winch (16). Hook (10) is raised and lowered using the crane winch assembly…
A device for handling an object such as a pipe comprising a cylindrical member, with four disposed adjacent one another elongate grooves or recesses in the peripheral direction in the surface thereof and extending in upward direction, with the first and last open at the bottom,…
An offshore tower structure comprises a central column (11) for supporting a platform (13) above the level of the sea (14). The column (11) extends upwardly from a base frame (10) and is braced by three support legs (12). The entire structure is rigid or stiff and is fixed…
Two vessels (50, 51) are provided for installing or removing a module (13) on or from a support structure (25) in a body of water. The module (13) is suspended between cranes (52, 53) on the vessels by connection to fixing points on opposite sides of the module (13), the fixing…
A method of assembly of an offshore tower comprises engaging a column with a sleeve of a support structure by positioning the column so that its longitudinal axis is vertical or nearly vertical, positioning the support structure so that the column-receiving sleeve is uppermost…
The upper block assembly of a crane is connected to the crane boom via a special universal joint having a pivot axis and a hollow shaft. The cable by which the lower block assembly is suspended is fed through the hollow shaft and extends to the crane winch via a pulley mounted…
For removing a pipeline (10) from the sea bed (11), a vessel (13) is provided with a frame (15) having a fixed clamp (14) and a movable clamp (16). The end of the pipeline is raised up into a position where it can be severed and the severed end section (10a) removed. The…
A pile (10) for offshore construction work is upended using two cranes (11, 12), one of which cranes (11) is connected via a sling (14) to one end of the pile and the other of which cranes (12) is connected via a sling (17) to two spaced apart connection points (19, 20) on the…
A tower structure having a central column, three support legs and a base structure which can be anchored to the sea bed by means of piles. The legs and base structure are constructed as an integral preformed base unit with a sleeve attached to the upper ends of the legs. The…
The invention provides a method of constructing an offshore tower structure having a base structure for positioning on the sea bed, a central enclosed tubular column containing services such as conductors and risers and extending from the base structure to above the water level…
A crane vessel (20) has a temporary load support structure (23) on which to support a load (22) in transit. For installation, the load is hooked up to the vessel crane (21) and the temporary support structure is removed to enable the vessel to set down the load on its tower…
A crane vessel (20) has a temporary load support structure (23) on which to support a load (22) in transit. For installation, the load is hooked up to the vessel crane (21) and the temporary support structure is removed to enable the vessel to set down the load on its tower…
A deflection measurement system uses a member (10), eg a tube, containing a head of liquid (11), eg water, which is connected at points (a, b, c, d, e) to a body (12) whose deflection is to be monitored. Pressure sensing means P, eg pressure gauges or transducers, measure the…
Gangway assembly with a movable bridge part resting on a first surface, extending to a second surface, and connected between the two ends by at least one wire cable gripping the top end of a gantry carried by the first surface, the support of the first end being achieved via a…
Load handling apparatus comprises an additional block and tackle assembly (15) connected between the load (17) and the hook (10) of a conventional hoisting device, increasing the hoist range of the device and, if replacing the conventional slings, enabling improved manipulation…