A method for creating a user program for a safety controller designed to control an automated installation having a plurality of sensors and a plurality of actuators involves several programming steps. The user program comprises a first program portion, in which safety-related…
Heckel Andreas
The invention relates to a control system (10) for controlling security-critical processes (28, 30). The control system (10) has a first control unit (14; 14, 54) for controlling a security-critical process (28, 30) and at least one signaling unit (18, 20, 22; 18, 20, 22, 56)…
A method for creating a user program for a safety controller designed to control an automated installation having a plurality of sensors and a plurality of actuators involves several programming steps. The user program comprises a first program portion, in which safety-related…
The lifting power station is provided to produce continuous rotating motion to operate the gases in a cycle. The gases arrive into the liquid through a lock. The gases arrive against a lifting basket (6) and propel a driving chain (7) by a lifting power.
The invention relates to a method for configuring a node (16, 18, 19) connected to a field bus (10), according to which a logical address (44) is allocated to the node (18). According to the invention, said method comprises transmitting the logical address (44) of an…
The present invention relates to a method for creating an application program for a safety controller (20) which is designed to control an automated system (22) having a multiplicity of sensors (26) and a multiplicity of actuators (24), wherein the application program comprises…
A system architecture uses at least two processors (2, 3) which jointly control a process and constantly compare their data. Running on one (2) of the two processors are a program complex that is checked for possible errors and an unchecked program complex. To prevent disruption…
In a multiple-channel monitoring device for monitoring the state of operation of installations, an additional test input (45a, 45b) per channel (2, 3) is provided at the evaluating and monitoring circuit to test the supply lines (7a, 7b) of signalling devices (1a, 1b) for…