A reporting system protects a train on a first section (S) of railway track from a following train. The first section (S) incorporates an 'all clear' reporting section (A) located downstream of a reporter sensor (1.1) as seen in the direction of travel. Operation of the…
Haubert Frank
The arrangement is coupled to an axle counting equipment (Z) using a cable (1) intended for a logic signal indicating that a railway line is free and another cable (2) intended for a logic signal indicating that the line is occupied. The arrangement evaluates the signals in an…
Schaltungsanordnung (X) zur Verbindung einer an einem Achszählabschnitt (A) vorgesehenen Achszählanlage (Z) mit einem mechanischen, elektromechanischen oder Relais-Stellwerk (S), wobei die Achszählanlage (Z) mittels einer ersten Leitung (1) für ein logisches Gleisfreisignal und…
A reporting system protects a train on a first section (S) of railway track from a following train. The first section (S) incorporates an 'all clear' reporting section (A) located downstream of a reporter sensor (1.1) as seen in the direction of travel. Operation of the…
A reporting system protects a train on a first section (S) of railway track from a following train. The first section (S) incorporates an 'all clear' reporting section (A) located downstream of a reporter sensor (1.1) as seen in the direction of travel. Operation of the…
A reporting system protects a train on a first section (S) of railway track from a following train. The first section (S) incorporates an 'all clear' reporting section (A) located downstream of a reporter sensor (1.1) as seen in the direction of travel. Operation of the…