Patents
Assignee / Organization

Genzel Eran

43Total Forward Citations
5Indexed Patents
9Avg Citations / Patent
2Portfolio H-Index
US 2011140657 A1#1933587 Most Cited · 33 citations2.2/yr · PR 5.44PendingUS · Application
Staged Deployment for Electrical Charge Spots
Inventors: Genzel Eran, Sadot Avner, Hanuna Shaul, Bahar DalitAssignee: Genzel Eran, Sadot AvnerFiled 2010-07-12

A method and system is provided to deploy electrical charge spots in stages according to demand. During a first stage a plurality of infrastructure adapters are installed. This may involve demolishing and rebuilding portions of the infrastructure and laying down power cables…

US 2012013302 A1#14407657 Most Cited · 7 citations0.5/yr · PR 2.49PendingUS · Application
Staged Deployment for Electrical Charge Spots
Inventors: Genzel Eran, Sadot Avner, Hanuna Shaul, Bahar DalitAssignee: Genzel Eran, Sadot AvnerFiled 2011-09-23

A method and system is provided to deploy electrical charge spots in stages according to demand. During a first stage a plurality of infrastructure adapters are installed. This may involve demolishing and rebuilding portions of the infrastructure and laying down power cables…

WO 2008/131064 A1#37633144 Most Cited · 2 citations0.1/yr · PR 1.10PendingWO · Application
Dynamic asymmetric nvram partitioning of communication devices in remote-upgradeable environments

A novel asymmetric memory partitioning mechanism for providing resolving and reducing memory limitations when an increase in software image size is required. Two partitions are created in non- volatile memory, one smaller than the other. The smaller partition stores a…

WO 2012/007784 A2#56010564 Most Cited · 1 citations0.1/yr · PR 0.80PendingWO · Application
Staged deployment for electrical charge spots

A method and system is provided to deploy electrical charge spots in stages according to demand. During a first stage a plurality of infrastructure adapters are installed. This may involve demolishing and rebuilding portions of the infrastructure and laying down power cables…

WO 2012/007784 A3#135492917 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Staged deployment for electrical charge spots

A method and system is provided to deploy electrical charge spots in stages according to demand. During a first stage a plurality of infrastructure adapters are installed. This may involve demolishing and rebuilding portions of the infrastructure and laying down power cables…