Patents
Assignee / Organization

Fuller Gary J

7Total Forward Citations
3Indexed Patents
2Avg Citations / Patent
1Portfolio H-Index
WO 2008/141356 A1#16564599 Most Cited · 6 citations0.3/yr · PR 2.39PendingWO · Application
Systems and methods for scheduling the operation of building resources

Described herein are systems and methods for scheduling the operation of building resources. In overview, some embodiments provide a central interface for allowing the scheduling of a large number of devices within a building, irrespective of the manufacturer or scheduling…

US 9,740,188 B2#60964492 Most Cited · 1 citations0.1/yr · PR 0.75ActiveUS · Utility
Systems and methods for scheduling the operation of building resources
Inventors: Fuller Gary J, Vongtongtip Stevun, Tickell SharonAssignee: Fuller Gary J, Vongtongtip StevunFiled 2015-11-24 · Granted 2017-08-22

Described herein are systems and methods for scheduling the operation of building resources. In overview, some embodiments provide a central interface for allowing the scheduling of a large number of devices within a building, irrespective of the manufacturer or scheduling…

US 2016077511 A1#75215613 Most Cited · 0 citations0.0/yr · PR 0.56PendingUS · Application
Systems and methods for scheduling the operation of building resources

Described herein are systems and methods for scheduling the operation of building resources. In overview, some embodiments provide a central interface for allowing the scheduling of a large number of devices within a building, irrespective of the manufacturer or scheduling…