The invention discloses a box girder positioning temporary supporting seat and a positioning construction method of a box girder. The supporting seat comprises a steel grit top, a base and a steel base plate, wherein the base is positioned below the steel grit top; the steel…
Fourth Engineering Co Ltd
The invention discloses a method for carrying out rapid face excavation construction on a loess tunnel by double rows of small conduits, which comprises the following steps of: excavation and supporting of a side front slope, i.e. after completing earth excavation of the side…
The invention discloses a two-stair five-step excavation construction method for a shallow-buried large-span soft plastic clay tunnel, relates to an excavation construction method for the shallow-buried large-span soft plastic clay tunnel and aims to solve the problems of a…
The invention discloses a construction method for a special-shaped steel cofferdam, which comprises the following steps of: measurement and positioning, erection of a steel pipe pile bracket, installation of a steel cofferdam laying fixation device, assembly, heightening and…
A construction method for a shallow-buried high-water-content clayed soil tunnel relates to a tunnel construction method and solves the problems of low integral strength of tunnel surrounding rock, poor self-stability of surrounding rock and easiness in occurrence of safety…
The invention discloses a construction method for enabling a large section tunnel to traverse a short distance gas outburst coal seam group. The construction method for enabling the large section tunnel to traverse the short distance gas outburst coal seam group includes…
The invention discloses a horizontal drilling prediction method of the expanded section of front geological condition of a tunnel face. In the tunneling process of a tunnel (1), the section (2) is expanded. Spy holes (3) are evenly arranged on the expanded section (2). The spy…
The invention discloses a method for automatically controlling bridge high pier construction perpendicularity. A plumb aligner control device is used, after concrete is poured to one section of a pier body, the deviation situation of a formed concrete pier body is detected, a…
The invention discloses a metro tunnel lining trolley steel template system comprising a trolley steel template. The trolley steel template is composed of a top template and two lateral templates, wherein the two ends of the two lateral templates are hinged; an inclined lateral…
The utility model relates to a bored pile drill bit picker, which is characterized in that a connecting flange and a bored pile drill rod standard joint are connected via bolts; a lifting plate is welded at the lower side of the connecting flange; the lower end of the steel wire…
The invention relates to a formworking jumbo construction process for a long and large box culvert. A formworking jumbo is used and a section construction method is adopted; formworking jumbo construction preparation is made, and comprises steps of constructing the foundation…
The invention relates to an excavation and construction method of an underground cavity ball coronary dome. The excavation and construction method includes the following steps: S1, a channel is constructed; S2, a dome part I is excavated, primary support is conducted on the dome…
The invention discloses an underground diaphragm wall and deserted underground civil air defense engineering intersection processing method. The method comprises the steps that when the vault structure of an air-raid shelter with a shallow burial depth is removed by adopting…
The invention discloses a rapid coal uncovering process and outburst prevention method of a large-section tunnel in expressways and railways, including the steps of during a tunneling process of the large-section tunnel of an expressway or a railway, before reaching an outburst…
The invention discloses a rail-traveling type hydraulic ditch cable trench trolley formwork system. The system comprises a hydraulic system, a traveling system, a steel formwork system, a truss, a screw rod, vertical sliding shoes, a horizontal sliding shoe, a limit lever and…
The invention provides a construction method for back-cable-balance single-side cantilever concreted beam bodies of slant-legged rigid frame bridges, which belongs to the technical field of bridge construction. The method comprises the following steps: A, pre-embedding…
The invention aims to install a quick positioning and connecting system in inserting and driving a steel pipe supporting pile and employ a construction method thereof when the foundation of a temporary structure steel pipe supporting pile in the water is inserted and driven. The…
The invention discloses an arch bridge abutment tunnel type large-angle inclined pile construction method comprising the following steps: an inclined pile is divided into an upper step and a lower step which are separately excavated by weak blasting, the top half circle and the…
The utility model relates to a rapid positioning and connection system used when inserting and ramming steel pipe supporting piles, which is arranged on a middle steel pipe supporting pile when inserting and ramming the foundation of the steel pipe supporting piles of a…
The utility model discloses a micro jacking and beam-moving device. The micro jacking and beam-moving device comprises a first vertical jack, a first vertical jack and a horizontal jack. A chute is composed of an integrated chute base plate and a chute end plate. The first…
The invention provides CA (cement and asphalt) mortar for CRTS II slab ballastless tracks, aiming to ensure the CA mortar to have better working performance and compression and breaking strength. The invention is characterized in that the polycarboxylic acid water reducer with…
The invention discloses a construction method of a shock-isolation rubber support. The construction method comprises the following steps: 1) binding a lower buttress with a steel bar; 2) arranging a positioning steel plate; 3) arranging a sleeve and an anchor bar; 4) pouring…
The invention discloses a construction method of a reserved grouting pipe of a tunnel vault. According to the technical scheme, the construction method comprises arranging waterproof fabrics on the primary supporting surface of a tunnel and binding secondary lining rebars;…
The utility model discloses an assembly type bent for the construction of a double-block unballasted track, comprising two tool rails arranged on two rows of double-block type sleepers in parallel, three combined frameworks uniformly distributed at the outside of two tool rails…
The invention discloses a tunnel ventilation interflow system and a method for allocating and adjusting wind power, which is mainly to solve rationally allocation of ventilation of an excavating face tunnel. The system consists of two or three ventilation devices and a plurality…