The invention relates to a method for treating subterranean formation comprising providing distributed temperature sensors, injecting a treatment fluid and monitoring the temperature across the treatment interval during the injection process.
Flamant Nicolas
The invention relates to a method for treating subterranean formation comprising providing distributed temperature sensors, injecting a treatment fluid and monitoring the temperature across the treatment interval during the injection process.
A method for method of monitoring the parameters of a cement plug ( 2 ) in a wellbore comprises; pumping a cement slurry down a wellbore to form a cement plug ( 2 ); providing a cable ( 1 ) through the cement plug ( 2 ) before the cement plug sets, wherein the cable comprises a…
Cement plug parameters in a wellbore may be monitored by providing a cable through the cement plug before the cement plug sets. The cable comprises one or more sensors that monitor the parameters, and the sensors are operated to transmit measurement data to the surface. The…
A method for method of monitoring the parameters of a cement plug (2) in a wellbore comprises; pumping a cement slurry down a wellbore to form a cement plug (2); providing a cable (1) through the cement plug (2) before the cement plug sets, wherein the cable comprises a sensor…
Improved equipment and methods for determining the waiting-on-cement time after a cementing operation involve an optic-fiber coil that immersed in the cement slurry downhole. The intensity of a reflected light signal from the coil is monitored versus time. Attenuation of the…
Apparatus ( 14 ) for supporting a cable ( 16 ) in a fluid-filled pipe ( 10 ) extending through an underground borehole, comprising a body for connection to an end of the cable extending along the pipe, the body being buoyant in the fluid filling the pipe, such that when the body…
Apparatus ( 14 ) for supporting a cable ( 16 ) in a fluid-filled pipe ( 10 ) extending through an underground borehole, comprising a body for connection to an end of the cable extending along the pipe, the body being buoyant in the fluid filling the pipe, such that when the body…
Improved equipment and methods for determining the waiting-on-cement time after a cementing operation involve an optic-fiber coil that immersed in the cement slurry downhole. The intensity of a reflected light signal from the coil is monitored versus time. Attenuation of the…
Apparatus (14) for supporting a cable (16) in a fluid-filled pipe (10) extending through an underground borehole, comprising a body for connection to an end of the cable extending along the pipe, the body being buoyant in the fluid filling the pipe, such that when the body is…
Improved equipment and methods for determining the waiting-on-cement time after a cementing operation involve an optic-fiber coil that immersed in the cement slurry downhole. The intensity of a reflected light signal from the coil is monitored versus time. Attenuation of the…
Improved equipment and methods for determining the waiting-on-cement time after a cementing operation involve an optic-fiber coil that immersed in the cement slurry downhole. The intensity of a reflected light signal from the coil is monitored versus time. Attenuation of the…