In a method for maintaining a combined-cycle power station at readiness, an supplemental firing ( 44 ) with a fresh air supply fan ( 46 ) and, preferably, the feed and supply pumps ( 21, 23, 31, 38 ) are operated continuously or intermittently when the combined-cycle power…
Erhard Liebig
In a cooling-air cooler ( 10 ) for a gas-turbine plant ( 29 ) of a power plant, in which cooling-air cooler ( 10 ) first means ( 13, 14, 15 ) for spraying water into the cooling-air flow and second means ( 16, 17, 18 ) for generating steam are arranged in a pressure vessel ( 11…
A saturated steam generation system ( 1 ) is supplemented with at least one gas turbine set ( 29, 30, 31, 36 ), at least one heat recovery steam generator ( 32 ), at least one topping steam turbine ( 37 ) and at least one steam mixing component ( 52 ). The topping steam turbine…
The present invention relates to a method for preventing the deposition of contaminants in steam systems. In a method of this type, deposits are prevented in a simple and economic manner by metering an additive into the steam, which additive adheres to the steam-side surface of…
An integrated power plant ( 10 ) comprises a gas-turbine set ( 11 ) with a compressor ( 12 ), a combustion chamber ( 13 ) and a gas turbine ( 14 ), a heat-recovery boiler ( 43 ) arranged downstream of the gas turbine ( 14 ), and a water/steam circuit ( 49 ) with a steam turbine…
The invention relates to a method of heating a liquid medium by means of a first thermal system ( 2, 3, 4, 7, 12, 13 ) and at least one second thermal system ( 5, 6, 6 A, 15, 16 ) following said first thermal system ( 2, 3, 4, 7, 12, 13 ), which thermal systems each have at…
In a method for increasing the power output of a combined-cycle power station, comprising at least one gas turbo group, at least one heat recovery steam generator and at least one steam turbo group, with the gas turbo group comprising at least one compressor, at least one…
A process is disclosed for thermally degassing a condensate or feedwater by heating the condensate or feedwater in a feedwater vessel/degassing means, to which preheated condensate is fed and from which feedwater for heating surfaces heated in a heat recovery steam generator is…
In a combined power station ( 32 ) having a plurality of power islands ( L 1 , . . . , L 3 ), which operate in parallel and which each comprise a gas turbine installation ( 3 ), a steam turbine ( 5 ), a generator ( 4 ), a water/steam circuit with a heat recovery steam generator…
In a method for setting or regulating the steam temperature of the live steam and/or reheater steam, in particular under part load, in a combined-cycle power plant ( 22 ) which comprises a water/steam cycle ( 20 ), in particular with a steam turbine ( 38 ), with a fired boiler (…
In a method for operating a combination power plant ( 15 ) with at least two power plant units ( 16 A, . . . , 16 D), each of which comprises a water/steam cycle, an accelerated start-up is achieved in a simple manner by removing a heat-transporting fluid from another operating…
A method for setting or regulating the steam temperature of the live steam and/or reheater steam, in particular under part load, in a combined-cycle power plant and a combined-cycle power plant so regulated. The power-plant has a water/steam cycle including a steam turbine,…
The present invention relates to a flow machine with a compressor ( 2 ) and at least one turbine ( 5 ), and in which an air intake booster ( 3 ) is arranged in an intake duct ( 1 ) of the compressor ( 2 ), and an exhaust gas booster ( 9 ) is arranged in an exhaust gas duct ( 8 )…
A system ( 1 ) generating saturated steam is replaced by at least one gas turbine set ( 29, 30, 31, 36 ), at least one waste-heat boiler ( 32 ) and at least one back-pressure steam turbine ( 37 ). The back-pressure steam turbine ( 37 ) is coupled to the gas turbine set ( 29, 30,…
In a process for thermally degassing the water in a steam system, in particular a heat recovery steam generator, which steam system preferably includes at least one steam drum, at least one economizer connected upstream of it, and at least one evaporator, economic, efficient and…
The startup time or the output gradient of a gas turbine plant during startup are limited by the maximum permissible temperature gradient. The increase in the fuel mass flow supplied, if appropriate in combination with the combustion-air mass flow supplied, is consequently also…
A tank ( 1 ) having saturated water ( 2 ) is connected to a pump ( 5 ) via a suction line ( 4 ). The actual values of the pressure and/or temperature in the tank ( 1 ) are detected to a measuring arrangement ( 7 ) and supplied to a control apparatus ( 8 ), in which the actual…
A system ( 1 ) generating saturated steam is replaced by at least one gas turbine set ( 29, 30, 31, 36 ), at least one waste-heat boiler ( 32 ) and at least one back-pressure steam turbine ( 37 ). The back-pressure steam turbine ( 37 ) is coupled to the gas turbine set ( 29, 30,…
In a method for preventing the deposition of impurities in steam systems, in which steam of a given steam quality flowing in them is subject to temperature and/or pressure changes, a simple prevention of deposits is achieved in that an appropriate structural configuration and…