Patents
Assignee / Organization

Edelson David N

51Total Forward Citations
9Indexed Patents
6Avg Citations / Patent
6Portfolio H-Index
US 2012266800 A1#10239001 Most Cited · 10 citations0.7/yr · PR 2.35PendingUS · Application
Spar mooring line sharing method and system

The disclosure provides a method and system of coupling end-to-end at least two existing mooring lines ( 12 A, 12 B) that are already deployed from the floating platform ( 56 ) to the seabed or other connecting structure to create a single shared line from the two lines. The…

WO 2012/039889 A1#10337553 Most Cited · 10 citations0.7/yr · PR 2.22PendingWO · Application
Offshore wind turbine installation vessel

The disclosure provides a vessel with a double pontoon arrangement joined together with a central bridge creating an offset "H" arrangement. The bridge spans the pontoons and includes a gantry structure on top of which sits a lifting system. Articulated tugs provide…

US 2013180444 A1#12018402 Most Cited · 9 citations0.7/yr · PR 1.76PendingUS · Application
Offshore wind turbine installation vessel

The disclosure provides a vessel with a double pontoon arrangement joined together with a central bridge creating an offset “H” arrangement. The bridge spans the pontoons and includes a gantry structure on top of which sits a lifting system. Articulated tugs provide…

US 8,757,077 B2#14620238 Most Cited · 7 citations0.6/yr · PR 2.17ActiveUS · Utility
Spar mooring line sharing method and system
Inventors: Edelson David N, Wang Jim, Buck Andrew, Sharp Peter, Hale Timothy ArthurAssignee: Edelson David N, Wang JimFiled 2010-04-30 · Granted 2014-06-24

The disclosure provides a method and system of coupling end-to-end at least two existing mooring lines ( 12 A, 12 B) that are already deployed from the floating platform ( 56 ) to the seabed or other connecting structure to create a single shared line from the two lines. The…

US 2013071207 A1#17949266 Most Cited · 6 citations0.5/yr · PR 1.56PendingUS · Application
Quick release system for topsides float-over installation on offshore platforms

The present invention provides a system and method that keeps a barge and grillage system on the barge in compression with a topsides supported by the grillage system during the transport, while providing a quick release system between the barge, grillage system, and topsides…

US 8,708,604 B2#18879950 Most Cited · 6 citations0.5/yr · PR 1.20ActiveUS · Utility
Quick release system for topsides float-over installation on offshore platforms

The present invention provides a system and method that keeps a barge and grillage system on the barge in compression with a topsides supported by the grillage system during the transport, while providing a quick release system between the barge, grillage system, and topsides…

WO 2009/120406 A1#33521085 Most Cited · 3 citations0.2/yr · PR 1.03PendingWO · Application
Pile translating and launching system and method

The disclosure provides an efficient system to obtain a pile from a storage location on a vessel and shift the pile across the vessel without significant rotation of the pile. The pile can be transferred into an assembly that can lower the pile and launch the pile. The…

WO 2012/039889 A9#91813025 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Offshore wind turbine installation vessel

The disclosure provides a vessel with a double pontoon arrangement joined together with a central bridge creating an offset "H" arrangement. The bridge spans the pontoons and includes a gantry structure on top of which sits a lifting system. Articulated tugs provide…

WO 2013/043444 A1#76807278 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Method of releasably coupling a topsides to a barge and system used therefore

The present application concerns a system and method that keeps a barge (115) with a grillage system (125) on the barge in compression with a topsides (110) supported by the grillage system during the transport, while providing a quick release system (180) between the barge and…