A method of repairing a house (eg Orlit house) having three main frames 1, 2, 3 connected by secondary beams 4, all made of prefabricated reinforced concrete, comprises removing the original secondary beams and replacing them with new timber beams 8 running essentially at right…
Dyson John Michael
A connector (1) comprises a first head (2) and a second head (3) joined together by an elongate portion (4). The elongate portion (4) is formed with serrations (8) formed on each outside of the elongate portion (4). The connector (1) may be used to connect adjacent panels (60)…
Rigid members 1 are placed around the perimeter of the existing floor of the dwellings. Each member is of L or Z cross-section. The horizontal arm 8 of the L provides support for a -replacement outer wall whilst the vertical arm 9 provides support for an intermediate load-…
A device 1 for breaking concrete or other hard material comprises a frame eg within which is defined a bight portion 4. The material to be broken is inserted into the bight portion 4 and is acted upon by a moveable breaking tool 6. Block 5 may have a chisel shape end, and…
An external propping system for supporting the floor and roof loads of a two-storey or multi-storey building comprises a number of pairs of props 8 located around the outside of the building at intervals. The props of each pair are connected together at first floor level by…