Patents
Assignee / Organization

Druyan Alexander

101Total Forward Citations
8Indexed Patents
13Avg Citations / Patent
4Portfolio H-Index
US 2012198462 A1#567020 Most Cited · 65 citations4.6/yr · PR 9.44PendingUS · Application
Workflow control of reservations and regular jobs using a flexible job scheduler

A scheduler receives at least one flexible reservation request for scheduling in a computing environment comprising consumable resources. The flexible reservation request specifies a duration and at least one required resource. The consumable resources comprise at least one…

US 9,015,724 B2#9555191 Most Cited · 11 citations1.0/yr · PR 1.88ActiveUS · Utility
Job dispatching with scheduler record updates containing characteristics combinations of job characteristics
Inventors: Druyan AlexanderAssignee: Druyan Alexander, IbmFiled 2009-09-23 · Granted 2015-04-21

The present invention provides a method, program product, and information processing system that efficiently dispatches jobs from a job queue. The jobs are dispatched to the computational nodes in the system. First, for each job, the number of nodes required to perform the job…

US 8,818,833 B2#10793023 Most Cited · 10 citations0.8/yr · PR 1.65ExpiredUS · Utility
Method and system for managing service requests across multiple systems

This present invention provides an efficient method and system to manage service requests across multiple service request systems. This management method involves merging all service requests from multiple systems into standard system, sorting the request according to some…

US 2012204185 A1#15801274 Most Cited · 7 citations0.5/yr · PR 1.53PendingUS · Application
Workflow control of reservations and regular jobs using a flexible job scheduler

A scheduler receives flexible reservation requests for scheduling in a computing environment comprising consumable resources. The flexible reservation request specifies a duration and a required resource. The consumable resources comprise machine resources and floating…

US 8,453,152 B2#22552287 Most Cited · 4 citations0.3/yr · PR 4.22ActiveUS · Utility
Workflow control of reservations and regular jobs using a flexible job scheduler
Inventors: Druyan Alexander, Li Wei, Marthi Kailash N, Xiang Yun T, Cham Linda CAssignee: Druyan Alexander, Li WeiFiled 2011-02-01 · Granted 2013-05-28

A scheduler receives at least one flexible reservation request for scheduling in a computing environment comprising consumable resources. The flexible reservation request specifies a duration and at least one required resource. The consumable resources comprise at least one…

US 8,082,546 B2#37198749 Most Cited · 2 citations0.1/yr · PR 1.12ActiveUS · Utility
Job scheduling to maximize use of reusable resources and minimize resource deallocation
Inventors: Coppinger Richard J, Druyan AlexanderAssignee: Coppinger Richard J, Druyan AlexanderFiled 2006-09-29 · Granted 2011-12-20

Jobs are scheduled such that resource reuse is maximized and deallocation of reusable resources is minimized. A multi-phase scheduling capability is provided in which during a first phase, weights are assigned to the reusable resources, and during a second phase, the jobs are…

US 9,723,070 B2#43666996 Most Cited · 2 citations0.2/yr · PR 0.93ActiveUS · Utility
System to improve cluster machine processing and associated methods
Inventors: Brelsford David Paul, Chan Waiman, Druyan Alexander, Skovira Joseph FAssignee: Brelsford David Paul, Chan WaimanFiled 2008-01-31 · Granted 2017-08-01

A system to improve cluster machine processing that may include a plurality of interconnected computers that process data as one if necessary, and at least one other plurality of interconnected computers that process data as one if necessary. The system may also include a…

US 8,812,578 B2#68430955 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Establishing future start times for jobs to be executed in a multi-cluster environment
Inventors: Druyan Alexander, Brelsford David PAssignee: Druyan Alexander, Brelsford David PFiled 2008-11-07 · Granted 2014-08-19

Start times are determined for jobs to be executed in the future in a multi-cluster environment. The start times are, for instance, the earliest start times in which the jobs may be executed. The start times are computed in logarithmic time, providing processing efficiencies for…