The utility model discloses a civil engineering structure for pre-buried sleeve of floor in building construction technical field, which comprises a wall body, it has the hole to open in the wall body, sets up pre-buried pipeline, pre-buried pipeline central authorities set up…
Ding Guoying
The invention discloses a method for monitoring capacity of a storage battery. The method comprises the following steps of: 1) judging whether the current storage battery is fully charged or not in a charging process; and 2) judging whether the current storage battery is fully…
The utility model discloses a prevent building construction support of falling, which comprises a bracket body, install two rail guards on the support body, two install two bracing pieces, four on the rail guard respectively be equipped with the shielding plate on the bracing…
A method is provided, including (a) upon a standard small form-factor pluggable (SFP) module being inserted into an SFP jack on a network host device, determining if the SFP module is a legacy device or a smart device, (b) upon determining that the SFP module is a legacy device,…