Patents
Assignee / Organization

Denman Marvin

49Total Forward Citations
8Indexed Patents
6Avg Citations / Patent
4Portfolio H-Index
US 2012124345 A1#2402430 Most Cited · 29 citations2.1/yr · PR 4.34PendingUS · Application
Cumulative confidence fetch throttling

A method and apparatus to utilize a fetching scheme for instructions in a processor to limit the expenditure of power caused by the speculative execution of branch instructions is provided. Also provided is a computer readable storage device encoded with data for adapting a…

US 2012124347 A1#13889657 Most Cited · 8 citations0.6/yr · PR 1.50PendingUS · Application
Branch prediction scheme utilizing partial-sized targets
Inventors: Dundas James D, Denman Marvin AAssignee: Dundas James D, Denman Marvin AFiled 2010-11-12

A method and apparatus to utilize a branch prediction scheme that limits the expenditure of power and the area consumed caused by branch prediction schemes is provided. The method includes accessing a first entry and a second entry of the data structure, wherein each entry…

US 9,836,304 B2#22001911 Most Cited · 5 citations0.6/yr · PR 1.28ActiveUS · Utility
Cumulative confidence fetch throttling
Inventors: Denman Marvin, Dundas James, Burgess Bradley Gene, Rupley JeffAssignee: Denman Marvin, Dundas JamesFiled 2010-11-15 · Granted 2017-12-05

A method and apparatus to utilize a fetching scheme for instructions in a processor to limit the expenditure of power caused by the speculative execution of branch instructions is provided. Also provided is a computer readable storage device encoded with data for adapting a…

US 2012124348 A1#26226958 Most Cited · 4 citations0.3/yr · PR 1.22PendingUS · Application
Branch predictor accuracy by forwarding table updates to pending branch predictions

A method and apparatus are provided for increasing the accuracy of a branch predictor. A branch prediction table provides a first instance of a branch prediction value associated with an instruction being speculatively executed a first time; and provides a second instance of the…

US 8,694,759 B2#33935939 Most Cited · 3 citations0.2/yr · PR 0.98ActiveUS · Utility
Generating predicted branch target address from two entries storing portions of target address based on static/dynamic indicator of branch instruction type
Inventors: Dundas James D, Denman Marvin AAssignee: Dundas James D, Denman Marvin AFiled 2010-11-12 · Granted 2014-04-08

A method and apparatus to utilize a branch prediction scheme that limits the expenditure of power and the area consumed caused by branch prediction schemes is provided. The method includes accessing a first entry and a second entry of the data structure, wherein each entry…

US 8,671,269 B2#134388232 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Branch predictor accuracy by forwarding table updates to pending branch predictions
Inventors: Dundas James David, Gupta Nikhil, Denman MarvinAssignee: Dundas James David, Gupta NikhilFiled 2010-11-16 · Granted 2014-03-11

A method and apparatus are provided for increasing the accuracy of a branch predictor. A branch prediction table provides a first instance of a branch prediction value associated with an instruction being speculatively executed a first time; and provides a second instance of the…

WO 2014/113217 A2#63211585 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Adaptive performance optimization of system-on-chip components

Methods, apparatus, and fabrication relating to adaptive performance optimization of a plurality of components in view of power consumption and demand, component activity, and thermal events. A method may comprise allocating a first power budget to a first component of an…

WO 2014/113217 A3#154570439 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Adaptive performance optimization of system-on-chip components

Methods, apparatus, and fabrication relating to adaptive performance optimization of a plurality of components in view of power consumption and demand, component activity, and thermal events. A method may comprise allocating a first power budget to a first component of an…