The step of comparing the pushing pressure developing when the pusher of a test hand presses an IC placed on the socket with the allowable press force calculated from the combined spring constant for the socket and IC, and the step of controlling the operation of the test hand…
Daito Corp
PROBLEM TO BE SOLVED: To provide a waterproof adhesion method and its structure for a part requiring sure waterproofness for a long period of the simple waterproof adhesion of a drainage pavement body, the floor board waterproofness or the like of a bridge or the like. SOLUTION:…
<P>PROBLEM TO BE SOLVED: To provide a method for sealing an inner part of a pipe structure, which easily seals the inner part of the structure comprising various sizes and shapes of pipes, and further makes such a sealed structure as to keep the sealed state for a long…
PURPOSE:To automate the packaging operation of a high stacked planographic papers in a paper mill by turning the stacked papers upside down in a cylinder with a reversing mechanism while holding the stacked papers as sandwiched by a pincher at their top and bottom and carrying…
PURPOSE:To properly control a pot life and a curing time and to cure the subject resin by using a mixture of an amine-based compound with an amine activity adjusting agent as a reaction initiator and curing an epoxy resin monomer with a polymercaptan-based curing agent.…
PURPOSE:To obtain the subject adhesive having durable high heat-resistance, electrical insulation, moisture resistance and adhesivity stable over a long period and good workability by mixing specific epoxy resin, phenoxy resin (halide) and curing agent at specific ratios…
<P>PROBLEM TO BE SOLVED: To improve the construction efficiency by requiring no troublesome recovery work such as a removal, to assure a uniform and stable sticking performance and a waterproofing performance over the entire surface of the pavement and to maintain the…
<P>PROBLEM TO BE SOLVED: To provide an aqueous inorganic zinc-rich coating composition usable as zinc-rich coatings, zinc shop primers, and thick film type zinc-rich paints which are corrosion prevention substrates of heavy-duty coating systems, achieving VOC reduction by…
PROBLEM TO BE SOLVED: To improve stability when installing a pipe coupling, and to easily assemble even by a less experienced employee when assembling the pipe coupling.SOLUTION: This pipe coupling includes a cylindrical socket body (1) having a through-hole (11) bored in a side…
PROBLEM TO BE SOLVED: To provide a poly(urethane)urea elastomer composition which, when used in spray molding, can be cured at ordinary temperature within a short time. SOLUTION: This composition comprises two packages of an isocyanate composition comprising an…
The step of comparing the pushing pressure developing when the pusher of a test hand presses an IC placed on the socket with the allowable press force calculated from the combined spring constant for the socket and IC, and the step of controlling the operation of the test hand…
<P>PROBLEM TO BE SOLVED: To inexpensively provide a structure causing no scattering and falling of concrete pieces from a handrail even if the handrail is broken down when a vehicle collides with the handrail of an elevated bridge of an automobile road. <P>SOLUTION:…
PURPOSE:To improve the efficiency of construction by reducing the number of all processes, particularly the number of curing processes, and to increase the durability of an anti-skid pavement by restraining the deterioration in anti- skid performance, which is caused with…
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。
PROBLEM TO BE SOLVED: To provide the waterproofing adhesive structure of a floor slab not only having excellent workability but also being capable of maintaining a waterproofing function having a high accuracy for a prolonged term. SOLUTION: A wet-surface adhesive layer 2 is…
PROBLEM TO BE SOLVED: To provide a crusher which can be made compact, can move by a transportation body vehicle, and is lifted to slantingly arrange a received conveyer when used. SOLUTION: Hydraulic cylinders 2 are provided in the lower end four corner parts of a crusher 1…
The step of comparing the pushing pressure developing when the pusher (8) of a test hand (1) presses an IC (5) placed on the socket (2) with the allowable press force calculated from the combined spring constant for the socket (2) and IC (5), and the step of controlling the…
<P>PROBLEM TO BE SOLVED: To notably improve the service durability of a floor slab by enhancing the adhesive strength of a secondary layer to a primary layer to suppress the degradation of waterproofing performance caused by bulging or separation while using a low-cost…
PROBLEM TO BE SOLVED: To provide an anti-bird device for an electric wire that comprises anti-bird means on which a bird cannot easily settle and a mechanism which easily rotates when the bird tries to settle on the anti-bird device, and that has high stiffness in the entire…
PURPOSE:To prevent a non-skid pavement body from being peeled together with a concrete bed surface layer by repeated impacts, suppress the deterioration of a non-skid aggregate, and promote the durability as the nonslip pavement body by absorbing and moderating a traffic impact…
The invention provides an anion generating device (10), comprising: a needle electrode (2), a counter electrode (3), an insulator (4), a support member (5), a power supply circuit (6), and wirings (7, 8). The counter electrode (3) is covered with an insulator (4). The needle…
<P>PROBLEM TO BE SOLVED: To surely carry out a corrosionproofing by forming a corrosionproof coated layer, in which a finished surface is smooth and has a uniform thickness, on the horizontal plane of a structure while improving an environment on the execution of works,…
PROBLEM TO BE SOLVED: To provide a poly(urethane)urea elastomer composition which, when used in spray molding, can be cured at ordinary temperature within a short time to give a product of excellent weather resistance. SOLUTION: This composition comprises two packages of an…
PROBLEM TO BE SOLVED: To provide an execution method, by which the scattering of the surface-layer aggregate and dulling and clogging of a draining paving body a new paved or beforehand paved are prevented and reduced, while giving the effects of slip prevention and reflection…