PURPOSE: A road safety barrier reinforcement material and technique using DSB technique is provided to reduce repair and reinforcement time of a safety barrier by rapidly coupling a reinforcement material and reinforcing the existing safety wall built in a side of the road.…
Daeshin Engineering Co Ltd
PURPOSE: A repair mortar composition including anti-bacteria property and chemical resistance is provided to improve bonding strength with an existing concrete and flexural strength of a mortar by applying a nylon fiber and an expansion material. CONSTITUTION: A repair mortar…
PURPOSE: A gutter structure for getting underground water and preventing bad smell from flowing back is provided to enable rainwater to be used in a dry season by getting the rainwater in a rainy season and to prevent bad smell from flowing back. CONSTITUTION: A gutter structure…
PURPOSE: A seismic retrofit method for a bridge pier is provided to reduce construction time by using spiral reinforcing materials having excellent tensile strength, corrosion-resistance, and adhesion. CONSTITUTION: A seismic retrofit method for a bridge pier is as follows. The…
PURPOSE: An improvement method of a median strip is provided to reduce construction time by manufacturing precast members in advance and assembling the manufactured precast members on a construction site on an existing median strip. CONSTITUTION: An improvement method of a…
PURPOSE: A waterproofing method of a concrete structure is provided to improve the durability of a concrete structure by preventing freezing, thawing, and carbonation. CONSTITUTION: A waterproofing method of a concrete structure is as follows. The deteriorated surface of a…
PURPOSE: A method for measuring infiltration depth of an inorganic anti-absorption material is provided to correct measuring conditions such as application voltage, solution concentration, and time of immersion according to the state of a test sample, and to accurately measure…