Patents
Assignee / Organization

Critical Path Inst

0Total Forward Citations
2Indexed Patents
0Avg Citations / Patent
0Portfolio H-Index
EP 2,281,190 A1#148762399 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
A method for evaluating a diagnostic test
Inventors: Cossman Jeffrey, Woosley RaymondAssignee: Critical Path InstFiled 2008-10-09

One aspect of the present invention generally relates to a method for standardizing and evaluating a diagnostic test. The method includes generating at least one of a standard, control, or sample required for a validation. Then, the at least one of a standard, control, or sample…

WO 2009/049071 A1#102298089 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
A method for evaluating a diagnostic test

One aspect of the present invention generally relates to a method for standardizing and evaluating a diagnostic test. The method includes generating at least one of a standard, control, or sample required for a validation. Then, the at least one of a standard, control, or sample…