Patents
US 7,894,783 B2#11804406 Most Cited · 9 citations0.6/yr · PR 1.94ActiveUS · Utility
Method of power management in a data replication process deployed in a wireless device
Inventors: Bulmer Russell KennettAssignee: Critical Path Data Ct LtdFiled 2006-05-19 · Granted 2011-02-22

A wireless information device automatically replicates data held on the device to a remote server over a wireless network. An application on the device (a) automatically determines the battery level of the device; (b) prevents sending data over the wireless network if the…

US 8,156,075 B2#15904115 Most Cited · 7 citations0.5/yr · PR 1.48ExpiredUS · Utility
Method of automatically replicating data objects between a mobile device and a server

Network operators can control how data replication services use available bandwidth, in order to make the most efficient usage of that bandwidth, using parameters applied to a data object to be replicated. The parameters may be both time dependent and also relate to how urgently…

US 7,836,264 B2#23247899 Most Cited · 4 citations0.2/yr · PR 1.77ExpiredUS · Utility
Method of replicating data between computing devices which each use local clocks
Inventors: East Simon Jeremy, Spence Stephen Timothy, Edwards Greenwell Thomas RalphAssignee: Critical Path Data Ct LtdFiled 2002-11-26 · Granted 2010-11-16

Where a first computing device is given responsibility for determining whether data that is time stamped by a second computing device is replicated or not, then the first device can compare a time stamp from the second device against a time signal from its own internal clock to…

US 8,688,771 B2#26973503 Most Cited · 4 citations0.3/yr · PR 1.13ExpiredUS · Utility
Method of providing content to a mobile web browsing device

Content is automatically provided to a mobile web browsing device from a web server, by the following process: (a) receiving at a computer, remotely connected to the device, a log of data identifying content that has been viewed by the device; (b) automatically sending updated…

US 2015334507 A1#49696628 Most Cited · 1 citations0.1/yr · PR 0.88PendingUS · Application
Apparatus for transferring advertising content to a mobile telephone

A mobile telephone obtains (or is supplied) advertising content from a remote server and locally stores that advertising content. The advertising content is then automatically shown in association with a running, in use (e.g. in foreground) application that generates a screen…

US 9,021,060 B2#61639796 Most Cited · 1 citations0.1/yr · PR 0.74ActiveUS · Utility
Method of enabling a user to interact with content received from a remote server
Inventors: Bramley Lei, Bulmer Russell, Tiller Andrew, Pepper Neil, French GrahamAssignee: Bramley Lei, Bulmer RussellFiled 2008-02-11 · Granted 2015-04-28

A user interacts with content received from a remote server; content (e.g. feeds from social networking sites, advertisements) is received over a wireless network at a mobile telephone, which then automatically displays a specific item of the content on the mobile telephone,…

US 2015242904 A1#153110599 Most Cited · 0 citations0.0/yr · PR 0.56PendingUS · Application
Method of enabling a user to interact with content received from a remote server

A user interacts with content received from a remote server; content (e.g. feeds from social networking sites, advertisements) is received over a wireless network at a mobile telephone, which then automatically displays a specific item of the content on the mobile telephone,…

US 8,270,961 B2#69480671 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Method of configuring a mobile telephone to interact with external services
Inventors: Bulmer Russell, French Graham, Pepper Neil, Rogers Stephen, Connors AdamAssignee: Bulmer Russell, French GrahamFiled 2007-01-26 · Granted 2012-09-18

A mobile telephone can be configured to interact with external services by using a client application on the telephone that interacts with several external services via an intermediary server. The server sends, to the mobile telephone, configuration information to enable or…

US 9,094,511 B2#121072884 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Apparatus for transferring advertising content to a mobile telephone
Inventors: Bramley Lei, Bulmer Russell, Tiller Andy, Pepper NeilAssignee: Bramley Lei, Bulmer RussellFiled 2007-11-15 · Granted 2015-07-28

A mobile telephone obtains (or is supplied) advertising content from a remote server and locally stores that advertising content. The advertising content is then automatically shown in association with a running, in use (e.g. in foreground) application that generates a screen…