Patents
Assignee / Organization

Crick Martin

40Total Forward Citations
4Indexed Patents
10Avg Citations / Patent
3Portfolio H-Index
US 8,849,639 B2#5024212 Most Cited · 18 citations1.5/yr · PR 2.31ActiveUS · Utility
Dynamic subsurface engineering
Inventors: Brown Alan Lee, Bulman Simon David, Crick Martin, Mathieu Gilles, Sagert RussAssignee: Brown Alan Lee, Bulman Simon DavidFiled 2010-09-17 · Granted 2014-09-30

An example system includes interconnected modeling modules that share knowledge to create a unified earth model dynamically representing a subsurface site. The system models and may simulate subsurface operations associated with, for example: hydrocarbon production and…

US 2013231901 A1#6304424 Most Cited · 15 citations1.1/yr · PR 2.73PendingUS · Application
Well pad placement
Inventors: Lu Zhengang, Valova Elena, Crick MartinAssignee: Lu Zhengang, Valova ElenaFiled 2012-08-28

A method can include assigning one or more constraints to an upper surface, assigning one or more constraints to a lower surface, defining a pad configuration, generating pad locations locatable on the upper surface that conform to the defined pad configuration and the assigned…

WO 2008/150877 A1#26719051 Most Cited · 4 citations0.2/yr · PR 1.17PendingWO · Application
Automated field development planning of well and drainage locations

A hybrid evolutionary algorithm ('HEA') technique is described for automatically calculating well and drainage locations in a field. The technique includes planning a set of wells on a static reservoir model using an automated well planner tool that designs realistic…

US 9,074,454 B2#30908544 Most Cited · 3 citations0.3/yr · PR 1.18ActiveUS · Utility
Dynamic reservoir engineering
Inventors: Crick Martin, Bulman Simon, O'halloran Colm, Wardell-yerburgh PeterAssignee: Crick Martin, Bulman SimonFiled 2009-01-08 · Granted 2015-07-07

An example method for performing reservoir engineering includes generating a geological model of a reservoir including a geological horizon, obtaining an offset relative to the geological horizon, and positioning a wellbore equipment item in a well completion design based on the…