Patents
Assignee / Organization

Cook Jonathan W

18Total Forward Citations
4Indexed Patents
4Avg Citations / Patent
2Portfolio H-Index
US 2014230470 A1#7563135 Most Cited · 13 citations1.1/yr · PR 2.55PendingUS · Application
Vehicle Idle Time Reduction System and Method
Inventors: Cook Jonathan WAssignee: Cook Jonathan W, City of TallahasseeFiled 2013-02-15

A system for reducing idle time in service vehicles such as police patrol cars. A bank of auxiliary batteries is provided. An electrically-powered auxiliary air conditioning compressor is also provided. The auxiliary air compressor is connected to the discharge and suction lines…

US 2013118185 A1#33620447 Most Cited · 3 citations0.2/yr · PR 1.02PendingUS · Application
Systems and methods for treatment of lng cargo tanks
Inventors: Cook Jonathan W, Lane Mark KAssignee: Cook Jonathan W, Lane Mark KFiled 2011-05-19

Systems and methods for gas-up and cool down of LNG cargo tanks are described herein. A system includes a supply vessel located at a waterway location, a receiving vessel moored to the supply vessel, and a manifold conduit. The supply vessel is configured to transfer natural gas…

US 9,010,140 B2#44797648 Most Cited · 2 citations0.2/yr · PR 0.89ActiveUS · Utility
Vehicle idle time reduction system and method
Inventors: Cook Jonathan WAssignee: Cook Jonathan W, City of TallahasseeFiled 2013-02-15 · Granted 2015-04-21

A system for reducing idle time in service vehicles such as police patrol cars. A bank of auxiliary batteries is provided. An electrically-powered auxiliary air conditioning compressor is also provided. The auxiliary air compressor is connected to the discharge and suction lines…

US 9,919,774 B2#112961937 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Systems and methods for treatment of LNG cargo tanks
Inventors: Cook Jonathan W, Lane Mark KAssignee: Cook Jonathan W, Lane Mark KFiled 2011-05-19 · Granted 2018-03-20

Systems and methods for gas-up and cool down of LNG cargo tanks are described herein. A system includes a supply vessel located at a waterway location, a receiving vessel moored to the supply vessel, and a manifold conduit. The supply vessel is configured to transfer natural gas…