A flame-retardant resin composition which contains 100-280 parts by mass (inclusive) of magnesium hydroxide (B) per 100 parts by mass of a resin component (A) that is composed of (a) 5-70% by mass (inclusive) of an unmodified ethylene-α-olefin copolymer having a density of 903…
Chiba Hiroki
PROBLEM TO BE SOLVED: To provide both a finish setting type building wall high in verticality and superior in resistance to earthquakes in which the vertical joints and required horizontal joints of finish set parallel panel groups are rigidly joined and its execution method.…
<P>PROBLEM TO BE SOLVED: To provide a built-up construction wall reducing the number of molding dies for built-up construction components, allowing the common die molding of the construction members, reducing a running cost as well as the initial investment of a molding…
<P>PROBLEM TO BE SOLVED: To solve the problem that a rice washing action is avoided nowadays since a younger generation tends to avoid cooked rice due to dietary diversification or the action with cold water in winter is troublesome, etc., and that much time and labor is…
To provide a method capable of performing, alone by an electric system (1), a series of processes showing [flying ball after being kicked-forced turnaround-forced return ball] in soccer training.SOLUTION: An electric system includes a connection line 3, a connection plate 4 and…