Patents
Assignee / Organization

Blotenberg Wilfried

20Total Forward Citations
5Indexed Patents
4Avg Citations / Patent
3Portfolio H-Index
US 2004151576 A1#10787806 Most Cited · 10 citations0.5/yr · PR 1.66PendingUS · Application
Process for the reliable operation of turbocompressors with surge limit control and surge limit control valve
Inventors: Blotenberg WilfriedAssignee: Blotenberg WilfriedFiled 2004-01-22

A process for the reliable operation of turbocompressors with a surge limit control and a surge limit control valve is described, in which the compressor delivers gases with different compositions and the composition of the gas (molecular weight) affects the performance…

US 2009205054 A1#26115995 Most Cited · 4 citations0.2/yr · PR 1.24PendingUS · Application
Process for protecting stored operating data of machinery or similar equipment

A process is provided for protecting stored operating data of machinery or similar equipment. The operating data are stored by means of a computer system belonging to a control system or by means of a similar computer system belonging to the equipment and wherein the operating…

WO 2009/092409 A1#23947748 Most Cited · 4 citations0.2/yr · PR 1.52PendingWO · Application
Method for regulating a turbomachine

According to the invention the following is carried out for regulating a turbomachine: a) a first state variable (ΔH) of a fluid delivered by the turbomachine is determined; b) a nominal threshold value of a second state variable (dV/dt) is determined from a stored nominal pump…

US 8,977,518 B2#44234860 Most Cited · 2 citations0.2/yr · PR 0.91ActiveUS · Utility
Device and method for performing a functional test on a control element of a turbo engine
Inventors: Blotenberg Wilfried, Gebhardt UlrichAssignee: Blotenberg Wilfried, Gebhardt UlrichFiled 2007-06-27 · Granted 2015-03-10

A turbomachine has a first process control element, a second process control element, and a test system for testing the first process control element. The first process control element and the second process control element influence the same process variable. To test the first…

WO 2008/000459 A8#66646887 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Device and method for performing a functional test on a control element of a turbo engine

Disclosed is a turbo engine comprising a first process control element (5), a second process control element (8), and a test system for testing the first process control element, the first process control element and the second process control element influencing the same…