<P>PROBLEM TO BE SOLVED: To provide a speech interaction method by a computer which enables speedy and efficient interaction by discriminating an interaction scene belonging to a specific scene predetermined according to an indication from a human, generating an answer…
Being Kk
<P>PROBLEM TO BE SOLVED: To provide a project planning device for properly determining a C.C. (critical chain), even in a project including a task having a hierarchical relation. <P>SOLUTION: The project planning device includes: an information acquisition means for…
<P>PROBLEM TO BE SOLVED: To provide a project progress management device for determining the priority of a task using a level common among different projects. <P>SOLUTION: The project progress management device includes: a plan information acquisition means for…
PROBLEM TO BE SOLVED: To provide a three-dimensional CAD system which reduces the load of computation processing by a computer by greatly decreasing the amount of data and makes the handling of planes consistent. SOLUTION: This three-dimensional CAD system sets basic figure…
PROBLEM TO BE SOLVED: To easily provide batch log-in service for a subcontractor through an ASP provider when data from a plurality of related companies are processed. SOLUTION: The program and the file management system as a computer system which controls the license control…
<P>PROBLEM TO BE SOLVED: To provide a clamping device capable of capturing an arc surface of a round workpiece such as a CD at uniform contact pressure and remounting the workpiece on an inspection device while aligning the workpiece. <P>SOLUTION: In the workpiece…
PROBLEM TO BE SOLVED: To easily provide a batch log-in service to an ASP entrepreneur. SOLUTION: This license control systems is a computer system coverning a license control method in an application service provider to be used on the Internet, and it is characterized in that it…
PROBLEM TO BE SOLVED: To reduce construction cost in working budget by generating a progress schedule in which a machine, labor, etc., are optimized based on the working budget. SOLUTION: This progress schedule generation system is provided with a means 11 to generate the…
<P>PROBLEM TO BE SOLVED: To provide an escape path computing apparatus, an escape path computing method and an escape time computing apparatus for reducing labor and time required for verification by automatically computing the escape time according to design data.…
<P>PROBLEM TO BE SOLVED: To provide an integration device capable of calculating construction cost by a unit price type integration method. <P>SOLUTION: The integration device is equipped with a database means 25 for storing unit price data on materials and labor,…
PROBLEM TO BE SOLVED: To provide a radiographic instrument, a radiography, a memory medium for a program to realize radiography, and a transmission medium to be transmitted capable of obtaining an image on a surface at a desired depth of an object. SOLUTION: An X-ray 12 is…
<P>PROBLEM TO BE SOLVED: To provide a communication method in a distributed environment wherein a plurality of terminals are connected with a telecommunication circuit and information is recorded in each memory of a distributed terminal. <P>SOLUTION: In specific and…
<P>PROBLEM TO BE SOLVED: To provide an interactive method using an electronic computer whereby distributed information is integrated or integrated information is summarized so that the information is bundled according to the scene of conversation to provide natural…
PROBLEM TO BE SOLVED: To provide a system capable of rapidly and correctly generating a working budget from a plan. SOLUTION: A conversion table 11 in which name, amount of a unit price to be used for estimation and working unit price are made correspond to one another is…
PROBLEM TO BE SOLVED: To provide a three-dimensional CAD system capable of reducing the load of the arithmetic processing of a computer by drastically reducing data quantity, and providing the dealing of faces with consistency. SOLUTION: In the three-dimensional CAD system,…
<P>PROBLEM TO BE SOLVED: To provide an answer support server for quickening an answer. <P>SOLUTION: This answer support server 1 is provided with a question storage means for receiving a question from a client 2a used by a questioner, and for storing it in a storage…
PROBLEM TO BE SOLVED: To exactly capture the costs of civil engineering works, and to always manage progress by easily inputting completed amounts in the job site of civil engineering works. SOLUTION: Budget data are inputted from an execution budget file 1, and an input slip in…
<P>PROBLEM TO BE SOLVED: To provide an evacuation simulation system with which a user can perform simulation of an evacuation time and a required stay real area automatically only by inputting schematic diagrams indicating evacuation routes even when the user is not an…
<P>PROBLEM TO BE SOLVED: To provide a bid support system wherein bid information allowing a bid is easy to be found. <P>SOLUTION: The bid support system S includes a bid information distribution server 1 and a bid management system 2. The bid information distribution…
PROBLEM TO BE SOLVED: To enable a user terminal and a Web server to perform cryptographic communication after they mutually confirm an opposite party on Internet. SOLUTION: The user terminal 4 requests the authentication of the Web server to an authentication server 3 through…
PROBLEM TO BE SOLVED: To solve the problem that the adjustment of a process schedule is difficult with respect to a minute adjustment in site level including the diligent preparation of a necessary resource every day in a conventional construction site mostly having only a…
PROBLEM TO BE SOLVED: To provide a system which links current budget information and management budget information to reflect data of a management budget on the current budget information and performs ordering management processing and prime cost management processing with…
<P>PROBLEM TO BE SOLVED: To provide a hot-air nozzle for brazing electronic component mounted on wiring board that can braze an electronic component to a circuit pattern formed on a wiring board in a defectless state, without being adversely affected by electronic…
<P>PROBLEM TO BE SOLVED: To provide an overload safety device of a robot hand having a simple structure and a compact, light-weight, and inexpensive configuration and capable of effectively functioning for the overload applied to the robot hand in the right and left…
<P>PROBLEM TO BE SOLVED: To solve problems of belt elongation and dust generation in a belt driving type, backlash in a gear driving type and heavy weight unsuitable for high-speed operation, in conventional rotary workpiece transfer devices. <P>SOLUTION: This rotary…