US 2005065826 A1#1207456 Most Cited · 43 citations2.0/yr · PR 16.47PendingUS · Application
System and process for job scheduling to minimize construction costs

Increased efficiency and lower cost job scheduling is provided by a system and method that optimizes for cost instead of makespan, and minimizes fluctuations in resource utilization. A schedule is constructed using a workflow scheduling system that includes a load leveler, a…

WO 2006/062500 A1#39913167 Most Cited · 2 citations0.1/yr · PR 1.02PendingWO · Application
System and process for job scheduling to minimize construction cost

Increased efficiency and lower cost job scheduling is provided by a system and method that optimizes for cost instead of makespan, and minimizes fluctuations in response utilization. A schedule is constructed using a workflow scheduling system that includes a load leveler (202),…