A scaffolding frame system comprising a pair of lower elongated vertical members each having an elongated linking member at the upper end of a vertical member for releasingly attaching the linking member to the upper end, a pair of upper elongated vertical members for…
Alinco Inc
A receiver apparatus includes a display apparatus for displaying signal strengths of signals of a plurality of reception frequencies. In the receiver apparatus, a receiver circuit of one system receives a high-frequency signal having a predetermined reception frequency, and a…
<P>PROBLEM TO BE SOLVED: To provide a neck/shoulder massaging machine, formed into a pillow shape which allows the head part of a user lying supine to rest on it, and designed to simultaneously execute massage of the neck and acupressure of the shoulder. <P>SOLUTION:…
A ladder wherein a plurality of rounds are pivotally and turnably mounted to and between the right stanchion and the left stanchion at proper spaces, and supporting arm levers are detachably fixed from both stanchions to the round by bolts or machine screws.
PROBLEM TO BE SOLVED: To provide a stepladder which enables a shaft to be easily lifted up when the shaft is lifted up in order to close both of leg bodies.SOLUTION: In a stepladder, rotary fittings 6, 7 are fixed to each of both ends at upper parts of both of leg bodies 1, 2 in…
PROBLEM TO BE SOLVED: To provide a temporary scaffolding allowing a ladder to be installed in an optional direction. SOLUTION: This temporary scaffolding is constructed by providing scaffolding boards 1 in a story state, connecting the upper and lower scaffolding boards 1 by the…
<P>PROBLEM TO BE SOLVED: To provide a safety handrail capable of being easily carried on an existing lower stage scaffold board and easily installed in a short time. <P>SOLUTION: This safety handrail is installed as a preceding temporary handrail of a new upper stage…
PROBLEM TO BE SOLVED: To provide a baseboard capable of being mounted and demounted extremely simply to and from a scaffolding board. SOLUTION: The baseboard 3 is installed along the side edge section of the scaffolding board 1, a plurality of sliding locking metal fittings 5…
<P>PROBLEM TO BE SOLVED: To provide a flooring plate which is low in cost, easily jointed to another one, and facilitates removal thereof. <P>SOLUTION: According to the structure of the flooring plate, a quadrangular plate body 1 has recesses 2 and protrusions 3…
PROBLEM TO BE SOLVED: To provide a safety handrail which ensures easy and safe exchanging work thereof. SOLUTION: Prefabricated scaffolding is built by providing a scaffolding frame 4 consisting of a pair of vertical members 1 and 1 and horizontal members 2 connecting upper ends…
PROBLEM TO BE SOLVED: To provide a preceding balustrade to be attached between columns facing each other of a scaffold by utilizing a flange hole or a pocket on the outside side far from a scaffold board among the flange holes or pockets of the columns.SOLUTION: The preceding…
PROBLEM TO BE SOLVED: To provide scaffolding boards which can block a clearance formed therebetween only by stretching the scaffolding boards over a cross member of a scaffolding frame. SOLUTION: The scaffolding board 10 stretched between the cross members 2 and 2 of the…
<P>PROBLEM TO BE SOLVED: To provide a scaffold device for simply and easily moving a work place, when inspecting and repairing a ceiling part of a tunnel provided with a traveling track of a vehicle such as an electric railcar. <P>SOLUTION: This scaffold device is…
<P>PROBLEM TO BE SOLVED: To provide a portable workbench which can be easily gripped and carried by a single hand of the operator. <P>SOLUTION: The portable workbench has an aperture 3 formed at a longitudinal center of a top board 1, which has a size that allows…
<P>PROBLEM TO BE SOLVED: To provide a safety handrail capable of preventing a worker from accidentally falling. <P>SOLUTION: This safety handrail is installed on a frame scaffold assembled in multiple stages while a scaffold plank 6 is installed across the horizontal…
PROBLEM TO BE SOLVED: To provide a footstool for work, capable of changing the height position of a top plate part under a stable grounding state by single-operation simple work.SOLUTION: The footstool includes an upper base (3) provided with a top plate part (2) and a lower…
PROBLEM TO BE SOLVED: To make it possible to uniformly and efficiently wash the upper face of a material to be washed without causing irregularities of washing. SOLUTION: This washing device is provided with nozzle heads 2A-2E for jetting high-pressure water above the upper side…
PROBLEM TO BE SOLVED: To provide a scaffolding-board gap cover capable of surely closing gaps formed between the side end sections of scaffolding boards stretched between horizontal members for a vertical frame for a scaffolding by simple works. SOLUTION: In the…
<P>PROBLEM TO BE SOLVED: To provide a construction site crime prevention system capable of effectively preventing invasion of a suspicious person illegally invading a building through a temporary scaffold and the like installed in a construction site of the building, an…
<P>PROBLEM TO BE SOLVED: To provide a suspended scaffolding installable in a short time, and easy in removal after work, without requiring to drive an anchor in a beam, a floor and a balustrade of an elevated spot. <P>SOLUTION: A substantially U-shaped main frame 2,…
<P>PROBLEM TO BE SOLVED: To provide a gable-side preceding balustrade which is easily attached as a preceding balustrade for an upper-side scaffold at the gable-side end of the scaffold, when the wedge binding-type scaffold is temporarily erected. <P>SOLUTION: When…
PROBLEM TO BE SOLVED: To substantially reduce damages that an operator suffers when the operator erroneously falls by efficiently absorbing an impact accompanying the falling stop by deformation of a locking frame, and to easily exchange the locking frame with a new article even…
<P>PROBLEM TO BE SOLVED: To provide a base for a scaffold board capable of using conventional scaffold boards as they are and capable of being easily fitted to/removed from the scaffold boards and which do not shake or deviate depending on makers of the scaffold boards.…
<P>PROBLEM TO BE SOLVED: To provide a temporary installation method of a work stage, which dispenses with building-up of a large-scale temporary scaffolding for the work stage and allows efficient handling in carrying in heavy loads such as heavy equipment and materials…