The invention relates to a technology for detecting and processing isolated stone groups in the shield excavation karren section, in particular to a method for processing isolated stone groups in the shield excavation karren section, aiming to solve the problems that the…
2nd Engineering Co Ltd
The invention relates to a method for constructing a bridge, in particular to the method for constructing a road swivel bridge and a railway swivel bridge by using a turnplate spherical hinge, which aims to solve the problems of the complex process, inconvenient construction,…
The invention relates to the field of tunnel construction, in particular to a method for constructing a tunnel by finishing full section curtain grouting from an upper-half section, which solves the problems of long construction period, difficult construction, high construction…
The present invention relates to shield-tunneling construction field, specially a kind of high hydraulic pressure soft soil layer HFE composite shield originating methods, solve soft soil layer shield launching reception technique problem under high water pressures, comprise the…
The invention relates to the field of tunneling shield construction, in particular to a roller guide rail station-passing construction method of a whole shield machine and solving the problems of high difficulty, high cost, long construction peroid and the like of the…
The invention relates to the technical field of tunnel shield construction, in particular to a method for relieving and cutterhead repairing of a shield machine in a weathering groove. By means of the method, the problems of complex process, long construction period, high cost…
The invention relates to the technical field of tunnel shield construction, in particular to a method for correcting the unconformable surface stratum shield tunneling construction, and solves the difficult problems of difficulty in correction, long construction period,…
The invention relates to the technical field of bridge construction, and discloses a system for lifting and sliding a large-tonnage steel box girder in a land area and a shoal area and a construction method thereof. The method comprises the following steps of: 1, arranging a…
The invention belongs to the technical field of tunnel construction, and particularly to a tunnel inverted arch combined integrated template and a method for concreting construction. The invention solve the problems in the prior art that small steel dies and wood dies are…
The utility model relates to a tunnel steel arch supporting device, in particular to a reinforcing connecting device of a tunnel soft-weak/loess surrounding rock steel arch and a locking foot anchor pipe, and the device is used for solving the problems of poor integrated…
The invention relates to a loess tunnel construction method, in particular to a collapse and sink intrusion limit construction method for treating a wind accumulated sand loess tunnel through a stride shed pipe. The problems of relatively larger construction space, high cost,…
The invention relates to the technical field of tunnel shield construction, in particular to a method for replacing a tail brush in extra large diameter shield driving under a high water pressure condition. The method solves the problems of huge risks, high technical…
The invention relates to the field of inclined shaft top brushing, in particular to an oblique-crossing inclined shaft upper arc guide top brushing construction method for a soft crushed rock layer, and solves the problems of the existing inclined shaft top brushing construction…
The invention relates to the field of tunnel shield construction, in particular to a sealing device for slurry shield starting of a water-rich sand layer and a sealing control method for the starting, and solves the problem that the conventional sealing devices are poor in…
The invention belongs to tunnel construction technical field, in order to solve during the steep V type coombe biased segments of the shallower height of Tunnel Passing coating, the problems such as the construction safety hidden danger for existing, the invention provides a…
The present invention relates to Metro station excavation artesian aquifer precipitation field, high hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in specially a kind of Metro station excavation, solves the closure problem…
The present invention provides a kind of karst area diversion tunnels to be crushed rich water section grouting treatment method, comprising the following steps: S1) geological prospecting is carried out to the rock crusher rich water section that water burst occurs, to…
The utility model belongs to metro shield section construction field, more particularly to a kind of external mounted shield launching portal hermetic seal device, solve existing shield launching portal hermetic seal device only to seal together, and because rubber tensile…
The invention discloses a controlled blasting construction method for a shallow-buried large-section tunnel. The method comprises the following steps of: performing trail blasting so as to determine the maximum explosive load; drawing up a controlled blasting scheme,…
The invention relates to the technology of tunnel entrance construction, in particular to a quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels, which solves problems that conventional construction…
The invention relates to the field of tunnel shield construction, in particular to an urban subway mudstone stratum connected aisle and shield tunneling parallel construction method, and solves the problems that due to the adoption of a blasting method in the prior art, the…
The invention relates to the field of tunnel shield construction, in particular to a parallel construction method for a shield arrival tunnel portal ring beam and a shield crossing station. According to the parallel construction method for the shield arrival tunnel portal ring…
The present invention relates to the technical field of tunnel construction, particular to a construction method for changing a single tunnel line into double lines. The method solves the problems of easy collapse, ,collapse caused by multiple times of perturbation towards wall…
The invention relates to the technical field of shield construction, in particular to a test device and a method for simulating a safe tunneling distance of a shield in a karst area. Including test box device, tunnel excavation analogue means, solution cavity analogue means and…
The present invention relates to subway work technical field, constructing metro tunnel method specially containing complicated geological and without shield launching place, solve the problems, such as in existing subway work because Subway Tunnel contains complicated…