Method for installing points in railway tracks and points for carrying out said method
Abstract
A method for installing points in railway tracks, characterized in that the points are entirely pre-assembled in functional units (1, 2, 7, 18) on a transport vehicle and the tongue area, the area in between the tracks and the core area, together with pre-assembled railway sleepers (6, 18), the moveable parts of said points, and, for instance, the tongue device and the safety devices are lowered into the place of installation in a pre-assembled state and joined to the adjacent tracks, whereupon the points are ballasted and the ballast of the track is packed, the connection lines for the drive mechanism of said points and the safety devices of the points are joined and the points are placed in a state of operation. The actuators of the points transported in a pre-assembled state are embodied in the form of hydraulic actuators (3, 4, 5). The hydraulic lines (6) connecting the actuators are elastically fixed to the sleepers (18). The actuators (3, 4, 5) are connected to the moveable parts of the points, e.g. the tongues (2) in such a way that they are pivotable about an axis extending in the longitudinal direction of the tracks by inserting elastic connecting members and/or crowned be
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 1.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 8,371,513 B2 | Track covering | 2013 | 0 |
References Cited — Backward Prior Art (0)
No backward patent references recorded.