Patents
US RE41999 E#18868348 Most CitedActiveUnited States (USPTO)Reissue

System and method for real time reservoir management

6Forward Citations (#18868348 Global)
0.4/yrCitation Velocity (#21347608 Global)
1.21Citation PageRank (#31489135 Global)
50Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A method of real time field wide reservoir management comprising the steps of processing collected field wide reservoir data in accordance with one or more predetermined algorithms to obtain a resultant desired field wide production/injection forecast, generating a signal to one or more individual well control devices instructing the device to increase or decrease flow through the well control device, transmitting the signal to the individual well control device, opening or closing the well control device in response to the signal to increase or decrease the production for one or more selected wells on a real time basis. The system for field wide reservoir management comprising a CPU for processing collected field wide reservoir data, generating a resultant desired field wide production/injection forecast and calculating a target production rate for one or more wells and one or more down hole production/injection control devices.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 6.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method comprising: receiving data indicative of at least one reservoir characteristic; with a processor determining, in relation to the data, a target production/injection in real time; and with the processor determining a control device setting in relation to the target production/injection.

  2. Claim 2Depends on #1

    The method of claim 1 further comprising: allocating the target production/injection between one or more selected reservoir management intervals of the reservoir; and determining the control device setting for a control device associated with at least one of the selected management intervals in relation to the target production/injection.

  3. Claim 3Depends on #2

    The method of claim 2 further comprising: comparing the target production/injection to an actual production/injection; and determining the control device setting in relation to a difference

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 3,045,750 AControl systems196229
US 3,760,362 AOil field production automation method and apparatus197338
US 3,971,926 ASimulator for an oil well circulation system1976109
US 4,461,172 AWell monitoring, controlling and data reducing system198443
US 4,559,610 AGas pumping system analog198533
US 4,633,954 AWell production controller system1987118
US 4,676,313 AControlled reservoir production1987135
US 4,685,522 AWell production controller system1987106
US 4,721,158 AFluid injection control system198878
US 4,738,313 AGas lift optimization198899
US 5,208,748 AMethod and apparatus for structuring and managing human communications by explicitly defining the types of communications permitted between participants1993299
US 5,442,730 AAdaptive job scheduling using neural network priority functions1995137
US 5,455,780 AMethod of tracking material in a well199533
US 5,531,270 ADownhole flow control in multiple wells1996121
US 5,547,029 ASurface controlled reservoir analysis and management system1996158
US 5,565,862 ACollection and management of pipeline-flow data199627
US 5,566,092 AMachine fault diagnostics system and method1996669
US 5,597,042 AMethod for controlling production wells having permanent downhole formation evaluation sensors1997269
US 5,636,693 AGas well tubing flow rate control199749
US 5,662,165 AProduction wells having permanent downhole formation evaluation sensors1997169
WO 9,741,330 A2Multi-lateral wellbore system and method for forming same—14
WO 9,749,894 A1Method and apparatus for testing, completing and/or maintaining wellbores using a sensor device—46
US 5,706,896 AMethod and apparatus for the remote control and monitoring of production wells1998212
US 5,710,726 ASemi-compositional simulation of hydrocarbon reservoirs1998116

Non-Patent Literature (5)

  • Ajayi, et al., "A Dynamic Optimisation Technique for Simulation of Multi-Zone Intelligent Well Systems in a Reservoir Development", SPE 84192 Society of Petroleum Engineers, Copyright 2003, pp. 1-7 (7 pages).
  • Allard et al., "Reservoir Management Making A Difference In Australia's First Oilfield Developed Entirely With Horizontal Wells", paper SPE 50051, SPE Asia Specific Oil & Gas Conf., Oct. 12-14, 1998, pp. 165-173 (9 pages).
  • Aminian, K., Ameri, S., "Application of artificial neural networks for reservoir characterization with limited data", Journal of Petroleum Science and Engineering 49, pp. 212-222, May 20, 2005.
  • Barroux, C.C., et al., "Linking Reservoir and Surface Simulators: How to Improve the Coupled Solutions," Society of Petroleum Engineers, SPE 65159, Copyright 2000, Abstract Only, 2 pages.
  • Beamer et al., "From Pore To Pipeline, Field Scale Solutions"; Oilfield Review, vol. 10, No. 2, 1998, XP000961345, pp. 2-19 (18 pages).