Stun grenades and methods of assembling stun grenades
Abstract
Stun grenades may include a fuze configured to ignite a delay material secured to a housing including a delay chamber in which the delay material is located. A handle of the fuze may be located over a final payload chamber of the series of payload chambers, payload material in the final payload chamber being configured to ignite after ignition of payload material in each other payload chamber of a series of payload chambers. Methods of assembling stun grenades may involve positioning an obstruction in a port extending between a delay chamber and a payload chamber of a series of payload chambers surrounding the delay chamber in a housing. A delay material may be packed in the delay chamber. The obstruction may be removed, and a payload material may be positioned in the payload chamber and the port.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 25 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A stun grenade, comprising: a housing comprising a longitudinal axis, a delay chamber defined in the housing proximate the longitudinal axis, a series of payload chambers defined in the housing and surrounding the delay chamber, each payload chamber of the series of payload chambers comprising openings at opposing ends of the housing and in communication with the delay chamber via a port extending between each payload chamber of the series of payload chambers and the delay chamber, each port being longitudinally and circumferentially offset from each other longitudinally adjacent port; a delay
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (7 of 7 total)
References Cited — Backward Prior Art (25)
Non-Patent Literature (1)
- European Search Report for European Patent Application No. 15164404.4, dated Jul. 22, 2015, 9 pages.