Patents
US 9,959,515 B2#33698031 Most CitedActiveUnited States (USPTO)Utility

Optimized asset maintenance and replacement schedule

3Forward Citations (#33698031 Global)
0.4/yrCitation Velocity (#21602032 Global)
1.01Citation PageRank (#41017029 Global)
10Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

There are provided a system, a method and a computer program product for generating an optimal preventive maintenance/replacement schedule for a set of assets. The method includes receiving data regarding an asset, said data including a failure rate function of said asset, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset. An optimal number K of preventative maintenance time intervals t k and an indication of a possible replacement is computed and stored for each asset by minimizing a mean cost-rate value function with respect to an electrical age of the asset. A first PM schedule is formed without consideration of labor and budget resource constraints. The method further generates a second maintenance schedule for a system of assets by minimizing a deviation from the optimal PM time intervals subject to the labor and budget resource constraints.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 3.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for decreasing a failure rate of each asset of a set of assets comprising: receiving, at a programmed hardware processor, data regarding an asset, said data including a failure rate function capturing a condition of said asset up to a point in time, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset; receiving, at said programmed hardware processor, a further input specifying a time horizon; determining, at said programmed hardware processor, whether there is a need to replace said asset, and when a replacement of said a

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Abiri-Jahromi et al.; "A Two-Stage framework for power transformer asset maintenance management-Part I: Models and formulations;" IEEE Transactions on Power Systems, vol. 28, No. 2, pp. 1395-1403; May 2013; Publisher: Institute of Electrical and Electronics Engineers Inc.; Country of Publication: US
  • Abiri-Jahromi et al.; “A Two-Stage framework for power transformer asset maintenance management—Part I: Models and formulations;” IEEE Transactions on Power Systems, vol. 28, No. 2, pp. 1395-1403; May 2013; Publisher: Institute of Electrical and Electronics Engineers Inc.; Country of Publication: US
  • Hager et al., "Gradient-Based Methods for Sparse Recovery," arXiv:0912.1660v1 [math.OC] 9 Dec. 2009, pp. 1-16.
  • Jongen, "Statistical Lifetime Management for Energy Network Components," Ph.D. Thesis, Delft University of Technology (2012) Jun. 7, 2012.
  • List of IBM Patents or Patent Applications Treated as Related.