Multi-zone completion assembly installation and testing
Abstract
A method of deploying a multi-zone completion assembly in a wellbore is disclosed. The method includes: placing an outer assembly below a surface location, wherein the outer assembly includes an activation device. The method further includes placing an inner assembly in the outer assembly, the inner assembly including a lower opening tool spaced from an upper opening tool. The method further includes activating the lower opening tool using the activation device The method further includes activating the upper opening tool independent of the lower opening tool using the activation device.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 1.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of deploying a multi-zone completion assembly in a wellbore, the method comprising: placing an outer assembly below a surface location, wherein the outer assembly includes an activation profile; placing an inner assembly in the outer assembly, the inner assembly including a lower opening tool spaced from an upper opening tool; activating the lower opening tool by moving the lower opening tool downhole past the activation profile and moving the lower opening tool uphole to engage with the activation profile to move a sleeve on the inner assembly that releases a collet of the lower open
- Claim 2Depends on #1
The method of claim 1 , wherein each of the lower opening tool and the upper opening tool is activated by mo
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 12,338,734 B1 | Low emission multi-zone hydrocarbon reservoir testing | 2025 | 2 |