Method, system and target for setting reference points on construction
Abstract
A position adjusting mechanism 30 with a target 10 mounted thereon is fixed at a plurality of reference points S 1 to S 16 respectively on a construction 1 , and initial 3D coordinates C 0 of the targets 10 are surveyed and stored. When deformation or distortion of the construction 1 occurs, a deviation ΔC (=Ct−C 0 ) of 3D coordinate Ct of each of the targets 10 from the initial 3D coordinate C 0 thereof are detected by a deviation detecting means 26 , and each of the targets 10 recovers the initial 3D coordinate C 0 by the position adjusting mechanism 30 thereof in accordance with the detected deviation ΔC. Preferably, 3D coordinates of the targets 10 are surveyed by a 3D measuring instrument which collimates the targets 10 to output 3D vectors for the targets 10 . The position adjusting mechanism 30 may includes guide stage for guiding the target 10 mounted thereon in a direction or in two directions that intersect at right angle, the direction or directions parallel to a surface F of the construction 1 , and feed mechanism for sliding the target 10 on the guide stage in predetermined amount.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 3.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
Method for setting reference points on construction comprising the steps of: fixing a position adjusting mechanism with a target mounted thereon at a plurality of reference points respectively on a construction; surveying and storing initial 3D coordinates of the targets; detecting a deviation of 3D coordinate of each of the targets from the initial 3D coordinate thereof when deformation or distortion of the construction occurs; and recovering the initial 3D coordinate of each of the targets by the position adjusting mechanism thereof in accordance with the detected deviation.
- Claim 2Depends on #1
Method for setting reference points on construction according to claim 1 , wherein 3D coordinates of the targets are surveyed by a 3D measuring instrument which collimates the targets to output 3D vectors for the targets.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (7)
Non-Patent Literature (1)
- The International Bureau of WIPO, International Preliminary Report on Patentability for International Application No. PCT/JP2013/075629, dated Apr. 7, 2016, eleven (11) pages.