Failover and resume when using ordered sequences in a multi-instance database environment
Abstract
An approach is disclosed for implementing failover and resume when using ordered sequences in a multi-instance database environment. The approach commences by instantiating a first database instance initially to serve as an active instance, then instantiating a second database instance to serve as an instance of one or more passive instances. The active database establishes mastership over a sequence and then processes requests for the ‘next’ symbol by accessing a shared sequence cache only after accessing a first instance semaphore. The active instance and the passive instance perform a protocol such that upon passive database detection of a failure of the active database, one of the passive database instances takes over mastership of the sequence cache, and then proceeds to satisfy sequence value requests. The particular order is observed in spite of the failure.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 30 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer implemented method for implementing failover when using ordered sequences in a multi-instance database environment, the method comprising: instantiating a plurality of database instances of a database, wherein the plurality of database instances comprises at least a first database instance initially designated as an active instance, and one or more other database instances initially designated as passive instances; identifying a master sequence associated with the database, wherein access to the master sequence is controlled through a global lock; allocating one or more portions of
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (30)
Non-Patent Literature (5)
- Advisory Action dated Mar. 3, 2015 for U.S. Appl. No. 13/309,394.
- Final Office Action dated Dec. 4, 2014 for U.S. Appl. No. 13/309,394.
- Maurice Herlihy, "Wait-Free Synchronization", ACM Transactions on Programming Languages and Systems, vol. 11, No. 1, Jan. 1991.
- Non-final Office Action dated Aug. 15, 2014 for U.S. Appl. No. 13/309,356.
- Non-final Office Action dated Feb. 2, 2015 for U.S. Appl. No. 13/309,356.