Islanded operating system
Abstract
The invention includes: charging/discharging devices including storage batteries and having a grid-connected function to perform charging/discharging operations on an electric power system and an islanded-operation function to supply the electric power system with a constant-voltage constant-frequency electric power; a monitor detects an electric power state of the charging/discharging device and to transmit detection output to the charging/discharging device; and a switching unit connects and disconnects commercial power source to and from electric power system. When a commercial power source is normal, the switching unit connects the commercial power source to the electric power system and charging/discharging devices establish a grid connection. When commercial power source fails, switching unit disconnects commercial power source from electric power system, charging/discharging device performs an islanded operation, and charging/discharging device performs a charging/discharging operation according to a detection output of monitor and performs control so that islanded operation electric power of charging/discharging device becomes constant.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An islanded operating system comprising: an electric power system configured to supply a load with an electric power from a commercial power source; first monitoring device for detecting a failure of the commercial power source; a first charging/discharging device including a storage battery, and having a grid-connected function to perform a charging/discharging operation on the electric power system and an islanded-operation function to supply the electric power system with a constant-voltage constant-frequency electric power; a second charging/discharging device having a grid-connected funct
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
References Cited — Backward Prior Art (21)
Non-Patent Literature (1)
- Office Action dated Feb. 7, 2017 in the counterpart Japanese patent application.