Patents
US 9,890,637 B2#37068465 Most CitedActiveUnited States (USPTO)Utility

Procedure for the construction of cross passages in double pipe tunnels

2Forward Citations (#37068465 Global)
0.2/yrCitation Velocity (#28739374 Global)
1.13Citation PageRank (#35287928 Global)
9Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The procedure for the construction of underground transport infrastructures, comprises the steps of: excavating an underground transport tunnel comprising a first pipe and a second pipe substantially parallel to one another; making a bypass tunnel connecting the first pipe and the second pipe which comprises the sub-steps of: introducing a launching chamber along the first pipe up to a first predefined position chosen along the longitudinal direction of the first pipe, the launching chamber being able to launch a tunnel boring machine; introducing an arrival chamber along the second pipe up to a second predefined position chosen along the longitudinal direction of the second pipe, the arrival chamber being able to receive the tunnel boring machine; excavating the bypass tunnel making the tunnel boring machine move forward from the launching chamber to the arrival chamber along a direction transversal to the first pipe and to the second pipe.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 2.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for the construction of underground transport infrastructures, comprising the steps of: excavating at least an underground transport tunnel comprising a first pipe and a second pipe substantially parallel to one another; and making at least a bypass tunnel connecting said first pipe and said second pipe; wherein said making at least a bypass tunnel comprises the sub-steps of: introducing a launching chamber along said first pipe up to a first predefined position chosen along a longitudinal direction of said first pipe, said launching chamber configured to launch at least a tunnel bori

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (2 of 2 total)

Non-Patent Literature (1)

  • International Search Report dated Sep. 30, 2015 from International Patent Application No. PCT/IB2014/066897 filed Dec. 15, 2014.